Council archive · source document
08/0052 - MCU - Detached House [As Published] · 132008.52
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 SECTION 5 The following question only applies when the application is seeking approval to carry out building work to the extent the work is in a declared fish habitat area. DECLARED FISH HABITAT AREA 5.1 ||s the proposed building work in a declared fish habitat area under the Fisheries Act 1994? LINo (Yes If yes, indicate what the proposed building work is reasonably necessary for (Tick applicable box/es) - The maintenance of existing structures, including for example the following structures, if the No (Yes structures were constructed in compliance with all the requirements, under any Act, relating to a structure of that type - + Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and weirs; + — Existing powerlines or associated powerline infrastructure « — Educational or research purposes relating to the fish habitat area (No [L1Yes + — Monitoring the impact of development on the declared fish habitat area Ono Dyes + Other purposes (Ono [Yes If yes to Other purposes, is the proposed building work to be carried out in a wild river area declared under the Wild River Act 2005? oO No - (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency Yes If yes, is afl of the building work for specified works under the Wild Rivers Act 2005? oO Yes - Refer to Footnote 5, 1 (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and Fisheries (OPI&F) and, subject to the dectaration for the relevant wild river area, assessment for the purposes of the Wild River Act 2005. if DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. CI No If no, is any of the proposed building work to be carried out in a wild river high preservation area? 0 No - . Refer to Footnote 5.1 (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes af the Wild River Act 2005. If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency 71 Yes - An application for the building work would be taken to be not properly made and the assessment manager must refuse to receive it. IPA scnedita 8, ad 1, fable 1. tera 2 (PA, schedute 8, pevt 2. kubie 5, fem 3 (selt-assessanie devenpunenty IP Ruguiation, scheduie 2, table 2, itern 24: 1° Reyulotion, scheduit: 1, pat 3 latae 1, dem 2; Wild Rivers Act 2005, sechon 43A: Fishers Act, section T6DC pwned iver area). 5A Unless the application is consistent with any property development plan applying to the land, the assessment manager must refuse to receive it Page 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0052 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.