Skip to the record
For the highest quality transcripts.

Original source · versioned page text

DA Form 1 - 75 Williams St

of 12

Page text shows just the words. Original shows the document exactly as it was published.

 Number of parts
 created

 12) Boundary realignment
 12.1) What are the current and proposed areas for each lot comprising the premises?
                        Current lot                                               Proposed lot
 Lot on plan description                Area (m )                             Lot on plan description               Area (m )



 12.2) What is the reason for the boundary realignment?



 13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
 (attach schedule if there are more than two easements)
                                                                                             Purpose of the                  Identify the land/
 Existing or
                                Width (m)                      Length (m)                    easement? (e.g.                 lot(s) benefited by
 proposed?                                                                                   pedestrian access)              the easement




Division 3 - Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
 14.1) What is the nature of the operational work?
  Road work                               Stormwater                                                    Water infrastructure
  Drainage work                           Earthworks                                   Sewage infrastructure
  Landscaping                             Signage                                      Clearing vegetation
 Other - please specify:
 14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
 Yes - specify number of new lots:
  No
 14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
 $

PART 4-ASSESSMENT MANAGER DETAILS

 15) Identify the assessment manager(s) who will be assessing this development application

 16) Has the local government agreed to apply a superseded planning scheme for this development application?
 Yes - a copy of the decision notice is attached to this development application
       The local government is taken to have agreed to the superseded planning scheme request - relevant documents
       attached,
  No


PART 5 - REFERRAL DETAILS

 17) Does this development application include any aspects that have any referral requirements?
 Note: A development application will require referral if prescribed by the Planning Regulation 2017.
        No, there are no referral requirements relevant to any development aspects identified in this development
       application - proceed to Part 6           v/
 Matters requiring referral to the Chief Executive of the Planning Act 2016:
Log in to download the original file

DA Form 1 - 75 Williams St.pdf · 6.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.