                                                                                      Officer:            Andrew Gaffney
                                                                                      Direct Telephone:   07 5329 6245
                                                                                      Our Reference:      51988.2849.05
                                                                                      Your Reference:     n/a

               5 June 2026


               Walt Construction Pty Ltd
               C/- Across Town Planning
               11 Bareki St
               WURTULLA QLD 4575
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 19 March 2026, requesting a minor change to an existing
               development approval. Council on 2 June 2026 decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              51988.2849.05

                   Street address:              On The Beach 49 Hastings St, Noosa Heads Qld 4567

                   Real property description:   BUP 8884

                   Planning Scheme:             Noosa Plan 2020 (26 September 2025)

               2.      DECISION DETAILS

               The following type of approval was issued on 15 March 1988.
               •       Town Planning Consent TPC 2021 for a Multiple Dwelling of 20 dwelling units, 8 shops and
                       2 restaurants.
               In relation to the request to make a minor change to the existing approval, Council on 2 June 2026,
               decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change.
               B.      Include additional condition 58, and
               C.      Include additional advisory note.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                             PO Box 141
               noosa.qld.gov.au                                                        Tewantin QLD 4565
               [email protected]                                                        07 5329 6500
                                                                                                          Page 1 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026
Full text of the other 9 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               1.     Submission to and approval by Council of building plans in accordance with the Building Act,
                      Council's By laws and Policies, and generally in accordance with the amended plans by Bligh
                      Jessup Robinson Architects numbered 1-6 and dated 29th February, 1988 approved in this
                      Consent and the Shire of Noosa Town Planning Scheme, apart from where amendments are
                      required, or dispensations have been granted in conjunction with this Consent.
               2.     The plans submitted for Building Approval are to comply with the following:-
                      a.      The restaurant shown as "Shop 1" shall be altered so that a 1.5 metre side building
                              setback is maintained within 15 metres of the northern boundary.
                      b.      Multiple dwelling units are to be not less than 40 square metres measured to the
                              satisfaction of the Building Surveyor.
                      c.      Eight (8) shops and two (2) restaurants ("Shop 2" and "Shop 7") are approved under
                              this application and the plans shall therefore be modified to reduce the number of shops
                              by one
                      d.      Structures between the 2nd floor and the Roof Level will be modified to provide a
                              setback in accordance with the Building Act to the satisfaction of the building Surveyor.
                      e.      The gatehouse structure is to be deleted.
               3.     Provision of at least thirty-one (31) off-street covered car parking spaces, and access thereto
                      which are to be provided with a sealed pavement and designed, drained, constructed and
                      maintained in accordance with the Town Planning Scheme, Council's Policies and to the
                      reasonable satisfaction of the Shire Engineer. Plans and specifications for these works are
                      to be submitted to the Shire Engineer for approval in conjunction with the Building Application.
               4.     Payment to Council of $96,000 in lieu of twelve (12) off-street car parking spaces, prior to
                      issue of building approval.
               5.     Transit Lounge areas on the first and second levels are approved for use by residents and
                      staff of the complex. The holding of functions or other similar events where members of the
                      public are admitted whether or not for a fee are not approved.
               6.     There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
                      creation of excessive noise, lighting, nuisance or other emissions.
               7.     The open space and setback areas are to be landscaped in accordance with the Noosa
                      Design Manual and a properly prepared landscaping plan to be submitted to and approved
                      by the Shire Planner, prior to the issue of a Building Approval. Such landscaping is to be
                      completed in accordance with the approved landscaping plan, prior to the premises being
                      occupied and maintained at all times thereafter to the reasonable satisfaction of the Shire
                      Planner.
               8.     Existing trees are to be retained, except where required to be removed due to building
                      operations or the conduct of the approved use.
               9.     Construction work is permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to
                      Saturday, except where extended hours are approved by the Building Surveyor.
               10.    Any advertising sign or device is to comply with the provisions of the Noosa Design Manual.
               11.    All lots that form part of this application are to be amalgamated in Title, prior to the issue of
                      a Building Approval.




                                                                                                         Page 2 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Page 3

               12.    Payment of contributions in accordance with Council's Policy on Water Supply and Sewerage
                      Headworks, current at the time of Building Approval. Calculations based upon the current
                      Policy including Price Index variation as at March, 1988 may be obtained from the Engineering
                      Department upon request.
                      If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
                      or trading bank guarantee for the required amount is to be lodged prior to the release of that
                      Approval. The contribution is then required to be made within fourteen (14) days of the issue
                      of Building Approval
               13.    The footpath to the frontage of the site is to be fully paved to the satisfaction of the Shire
                      Engineer.
               14.    The developer shall bear the cost of alteration of any public utility or facilities
                      necessitated by the development of the land or associated construction works external
                      to the site.
               15.    Connection to Council's existing water supply and sewerage reticulation systems at the
                      developer's expense to the standards and requirements of Council's Shire Engineer.
               16.    Floor levels for all buildings and other structures, car park areas and fill levels for the site
                      are to be in accordance with the requirements of the Shire Engineer. Such levels shall
                      be provided on application to the Council's Engineering Department. Any filling or other
                      development works undertaken on the site shall becarried out so as not to cause the
                      ponding of water on any adjoining lands and the blockage or interference with any
                      natural watercourses. No earthworks or filling works are to be undertaken until issue of
                      a Building Approval.
               17.    Roof and surface water is to be collected on site and to be discharged through a single
                      underground drain line into existing drainage in Hastings Street to the satisfaction of the
                      Shire Engineer.
               18.    The roof top terrace shall not contain roofing over structures other than clear acrylic
                      sheeting placed flat over pergolas to prevent entry of stormwater to spa baths. Such
                      roofing shall be of the minimum size only needed to prevent such entry, to the satisfaction
                      of the Building Surveyor. The pergolas shall not intrude into a 40 degree slope line from
                      the outer edge of the building in accordance with the Noosa Design Manual.
               19.    The applicant shall construct a walkway along the beach frontage to a design approved
                      by the Shire Engineer. Council may accept a contribution in lieu of these works.
               20.    Balconies shall be designed and construction so that access and handrails are a minimum
                      of 1.5 metres setback from the side boundaries.
               21.    The existing access through the kerb and channel is to be replaced to the requirements
                      of the Shire Engineer.
               22.    Strengthening of the existing rock wall is to be carried out to the requirements of the
                      Shire Engineer.
               23.    All sand excavated from the site surplus to the requirements of the building shall be deposited
                      in an approved manner on the Noosa Main Beach. The building works shall be organised so
                      that contamination of the sand by foreign materials will be minimised. The contractor is
                      required to discuss with the Shire Engineer or Building Surveyor, the proposed means of
                      excavation· prior to any .excavating works proceeding.
               24.    Contributions for roadworks and landscaping shall be payable in accordance with the draft
                      Hastings Street Development Control Plan as follows:-
                      Roadworks and Landscaping - $12,096
                      Such contribution shall be paid prior to the issue of a building permit.




                                                                                                       Page 3 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Page 4

               25.    Submission of two sets of professionally drawn scale plans in compliance with Council's
                      Code controlling food establishments for approval by Council's Health Surveyor, for any food
                      premises proposed to be included in the development. Approval is to be obtained prior to
                      fitting out the building.
               26.    An annual licence is to be obtained under the Food Hygiene Regulations of 1976 from
                      Council's Health Department.
               27.    Provision of approved refuse containers in accordance with the requirements of the Refuse
                      Management Regulations of 1983 for the storage and collection of refuse to the satisfaction
                      of Council’s Health Surveyor.
               28.    Provision of an imperviously pave9, drained and enclosed area to accommodate all refuse
                      containers to the reasonable satisfaction of Council's Health Surveyor. This area is to be
                      aesthetically screened from any road frontage or adjoining property boundary and is to be
                      setback a distance of two (2) metres from any road frontage. A suitable hosecock and hoses
                      to be located in the vicinity of the refuse container area.
               29.    Any flat or unit intended to be let out for fee or reward is to be licenced annually with Council's
                      Health Department in accordance with the provisions of Chapter 43 of Council's By-Laws
                      prior to such letting.
               30.    The swimming pool shall be licensed annually with the Council's Health Department in
                      accordance with the provisions of Chapter 42 of Council's By-Laws.
               31.    The footpath and setback areas are to be kept clear of goods, signs and street furniture not
                      approved by Council.
               32.    Should S.E.Q.E.B. require provision of a transformer, such provision is to be made to the
                      satisfaction of S.E.Q.E.B. and the Shire Planner. The transformer is not to be located within
                      landscaping areas unless approved by the Shire Planner.
               33.    Approval is to be obtained from the Beach Protection Authority for buildings or other
                      structures proposed to be located within the Coastal Management Control District
               34.    An identification survey of the subject site is to be carried out by a Licensed Surveyor
                      and is to be submitted to Council at the time of foundation inspection by Council's
                      Building Surveyor or immediately thereafter. Such survey shall set out the boundaries of
                      the site and the position of the buildings on the site.
               35.    Submission of a cash bond or trading bank guarantee to the sum $50,000, prior to the
                      issue of Building Approval:
                      a.      against payment of water supply and sewerage headworks charges ($35,000);
                      b.      to secure performance of conditions($15,000);
                      The cash bond or trading back guarantee may be returned to the applicant upon
                      payment of the required sums and performance of the conditions of approval.
               36.    The owner is to request to Council, revocation of TPC 1900 within 60 days of receipt of
                      building approval.
               37.    The provisions of this Town Planning Consent are to be effected, prior to the
                      commencement of the specific use granted under this Consent Council reserves the
                      right to call upon the bond or guaranteed sum referred to in this approval for the purpos.es
                      of litigation should the use not be conducted in accordance with this Approval.
               38.    This Consent may be revoked pursuant to Section 33 (16D) of the Local Government Act if
                      substantial progress has not been made in the erection of any building or other structures
                      in. accordance with this Consent or the rights conferred by this Consent are not exercised in
                      accordance with this Consent within two (2) years of the date thereof.




                                                                                                          Page 4 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Page 5

               Additional conditions - 51988.2849.04 - 11 June 2020
               Approved Plans
               39.    Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans. The approved plans are listed in the following table and may be
                      amended by these conditions and annotations on the plans.

                         Plan No.            Rev   Plan Name – Prepared by                          Date

                                                   Staging/Site Plan as annotated by Council,
                         276_101             P5                                               08.06.2020
                                                   prepared by Maddock

                         276_102                   Pool - Detail Plan as annotated by Council,
                                             P5                                                08.06.2020
                                                   prepared by Maddock

                         276_103             P5    Pool – Wall Elevations, prepared by Maddock 08.06.2020

               Nature and Extent of Approved Use
               40.    The pergola must remain permeable and constructed with 100mm x 6mm aluminium flat
                      bars, or the like, in a vertical arrangement, spaced a minimum of 50mm apart.
               41.    The aluminium bars must be treated so as not to result in glare to surrounding properties
               42.    Existing landscaping within The Parade must not be damaged, removed or destabilised.
               43.    No works or storage of materials is to occur within The Parade, unless authorised by a further
                      permit.
               44.    The increased height of the wall to the eastern side of the steps is not to exceed the height
                      of the existing wall on the boundary.
               45.    The new glazing to the beachfront fence must be transparent and no higher than the existing
                      glazing.
               Additional conditions - 51988.2849.03 - 17 September 2020
                      Approved Plans
               46.    Development authorised by this approval must be undertaken generally in accordance with
                      the Approved Plans. The approved plans are listed in the following table and may be
                      amended by these conditions and annotations on the plans.

                        Plan No.       Rev Plan Name – Prepared by                                Date

                        A002           Q    Existing Façade,     prepared    by   Kings   Lane 05/02/2020
                                            Architects

                        A100           Q    Proposed Refurbishment, prepared by Kings Lane 05/02/2020
                                            Architects
                                            As annotated by Council

                        A101           Q    Proposed GR FLR Refurbishment, prepared by 05/02/2020
                                            Kings Lane Architects
                                            As annotated by Council

                        A104           Q    Proposed Areas,      prepared    by   Kings   Lane 05/02/2020
                                            Architects

                        A300           Q    Proposed Section, prepared by Kings Lane 12/02/2020
                                            Architects


                                                                                                      Page 5 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Page 6

                        A310           Q      Proposed Elevations, prepared by Kings Lane 05/02/2020
                                              Architects

                        A800           Q      Proposed Perspective 01, prepared by Kings Lane 05/02/2020
                                              Architects

                        A801           Q      Proposed Perspective 02, prepared by Kings Lane 05/02/2020
                                              Architects

                        LD 01          C      Landscape Design, prepared by Environmental 3 February 2020
                                              Landscape Planning
                        Sheet 1 of 4

                        LD 02          C      Landscape Design, prepared by Environmental 3 February 2020
                                              Landscape Planning
                        Sheet 2 of 4

                        LD 03          C      Landscape Design, prepared by Environmental 3 February 2020
                                              Landscape Planning
                        Sheet 3 of 4

                        LD 04          C      Landscape Design, prepared by Environmental 3 February 2020
                                              Landscape Planning
                        Sheet 4 of 4

                      Nature and Extent of Approved Use
               47.    The area to be used for outdoor dining is limited to 14.1m2 of use area.
               48.    No works or storage of materials is to occur within The Parade, unless authorised by a further
                      permit.
                      Landscaping
               49.    The development site must be landscaped in accordance with the Approved Plans.
               50.    The existing Pandanus trees located within the raised garden beds must be retained in
                      accordance with the Approved Plans. A Qualified Person* must be engaged for the duration
                      of the works to:
                      a.      Supervise tree protection within the development site and frontages, prior to, during
                              and following construction in accordance with AS 4970, Protection of trees on
                              development sites.
                      b.      Provide Council with certification and photographic report on supervising construction
                              works within the tree protection zone of the retained Pandanus trees, following the
                              completion of the approved works.
               51.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               52.    All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
               53.    No signage is to be located within the landscaped areas.
                      Damage to infrastructure
               54.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
                      bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
               55.    Where damage occurs to any Council asset as a result of the landscaping works, the damage
                      must be repaired immediately where it creates a hazard that presents risk to person or
                      property. Non-hazardous damage must be repaired prior to completion of works.


                                                                                                      Page 6 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Page 7

                      Car Parking
               56.    The applicant must comply with the requirements of any Infrastructure Agreement entered
                      into with the Council with respect to the payment of car parking contributions in relation to
                      the proposed development. In the event that the Infrastructure Agreement does not apply a
                      minimum of one car parking space must be provided and marked on the site and made
                      available and accessible at all times while the use is open for business.
               57.    A retaining wall must be maintained for the full length of the property to main beach with
                      removable flood gates installed or available for installation prior to any significant coastal
                      storm event to each entry point. These structures must be designed to mitigate the impact of
                      wave overtopping of the Council controlled beach seawall during a significant event.
                      Certification must be submitted to Council from a RPEQ which certifies that these structures
                      meet the requirements of this condition.
               Additional condition – 51988.2849.05 - 02 June 2026
               Approved Plans - May 2026
               58.    Additional approved plans are provided in the following table and may be amended by these
                      conditions and annotations on the plans.

                        Plan No.       Rev   Plan Name – Prepared by                          Date

                                             Zone 1 - Hastings Street Entrances & Atrium
                        279_206        P2                                                23.03.09
                                             Roof plan, prepared by Maddock

                        279_203              Zone 2 - Husk & Copenhagen Roof plan,
                                       P1                                          23.03.09
                                             prepared by Maddock

                        279_302.1            Zone 2 - Husk & Copenhagen Wall sections,
                                       P1                                              23.03.09
                                             prepared by Maddock

                        279_301.1            Zone 1 - Hastings Street Entrances & Atrium
                                       P1                                                23.03.09
                                             structure, prepared by Maddock

                        279_301.2            Zone 2 - Husk & Copenhagen structure,
                                       P1    prepared by Maddock                   23.03.09
                                             Annotated by Council

               5.     REASONS FOR APPROVAL

               1.     The proposal complies with the Overall Outcomes of the Noosa Heads Locality Code as the
                      development will provide for entertainment and dining premises, providing interest for visitors
                      and residents accommodated in the immediate area, whilst outdoor dining facilitates a vibrant
                      pedestrian friendly streetscape;
               2.     The development is consistent with the bulk and scale of buildings within proximity to the
                      subject site, presenting an improved, high quality built form and landscaping along The
                      Parade, and providing a direct link to Main Beach.
               6.     REFERRAL AGENCIES

               Not applicable.




                                                                                                       Page 7 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Page 8

               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               1.     A Qualified Person, for the purpose of:
                      a.      Undertaking, supervising tree works and preparing arboriculture certification, is
                              considered to be a person with a minimum three years current experience in tree
                              protection, hazard identification/mitigation assessment and either:
                              i.       International Society of Arboriculture (ISA) certification; or
                              ii.      A Diploma of Arboriculture.
               2.     Prior to the construction or installation of any awning, shade structure or associated
                      infrastructure located on, under or over Council-controlled Road, the applicant/owner must
                      obtain a Permit for Infrastructure Works on or Over a Road from Noosa Council (Property
                      Section) and any other required approvals, including Building Approval and structural
                      engineering certification.
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                    Subject of the required Development Permit

                Development Permit for Building Works                  All building works

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.




                                                                                                         Page 8 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Page 9

               13.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,

               Andrew Gaffney
               Senior Development Planner | Development Assessment
               Development & Regulation



               Enc:     Appeal Rights
                        Approved Plans/Documents

               DECISION NOTICE HISTORY
               •     Original Decision Notice – 15 March 1988.

               •     Decision Notice – Minor – 51988.2849.02 – 27 May 1988, Cancelled.

               •     Decision Notice – Minor – 51988.2849.04 – 11 June 2020, with additional conditions 39-45.

               •     Decision Notice – Minor – 51988.2849.03 – 17 September 2020, additional conditions 46-57, include Advisory Note & enter into an
                     Infrastructure Agreement (car parking)

               •     Decision Notice – Minor – 51988.2849.05 – 2 June 2026, include additional condition 58 and include additional Advisory Note.




                                                                                                                                  Page 9 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Page 10

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 10 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Used in these records

About this file

File size
186 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 51988.2849.05 (As Published).pdf · 186 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.