Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Minor Change Existing Approval - 51988.2849.05 (As Published)

of 10

Text shows just the words. Original shows the document exactly as it was published.

               12.    Payment of contributions in accordance with Council's Policy on Water Supply and Sewerage
                      Headworks, current at the time of Building Approval. Calculations based upon the current
                      Policy including Price Index variation as at March, 1988 may be obtained from the Engineering
                      Department upon request.
                      If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
                      or trading bank guarantee for the required amount is to be lodged prior to the release of that
                      Approval. The contribution is then required to be made within fourteen (14) days of the issue
                      of Building Approval
               13.    The footpath to the frontage of the site is to be fully paved to the satisfaction of the Shire
                      Engineer.
               14.    The developer shall bear the cost of alteration of any public utility or facilities
                      necessitated by the development of the land or associated construction works external
                      to the site.
               15.    Connection to Council's existing water supply and sewerage reticulation systems at the
                      developer's expense to the standards and requirements of Council's Shire Engineer.
               16.    Floor levels for all buildings and other structures, car park areas and fill levels for the site
                      are to be in accordance with the requirements of the Shire Engineer. Such levels shall
                      be provided on application to the Council's Engineering Department. Any filling or other
                      development works undertaken on the site shall becarried out so as not to cause the
                      ponding of water on any adjoining lands and the blockage or interference with any
                      natural watercourses. No earthworks or filling works are to be undertaken until issue of
                      a Building Approval.
               17.    Roof and surface water is to be collected on site and to be discharged through a single
                      underground drain line into existing drainage in Hastings Street to the satisfaction of the
                      Shire Engineer.
               18.    The roof top terrace shall not contain roofing over structures other than clear acrylic
                      sheeting placed flat over pergolas to prevent entry of stormwater to spa baths. Such
                      roofing shall be of the minimum size only needed to prevent such entry, to the satisfaction
                      of the Building Surveyor. The pergolas shall not intrude into a 40 degree slope line from
                      the outer edge of the building in accordance with the Noosa Design Manual.
               19.    The applicant shall construct a walkway along the beach frontage to a design approved
                      by the Shire Engineer. Council may accept a contribution in lieu of these works.
               20.    Balconies shall be designed and construction so that access and handrails are a minimum
                      of 1.5 metres setback from the side boundaries.
               21.    The existing access through the kerb and channel is to be replaced to the requirements
                      of the Shire Engineer.
               22.    Strengthening of the existing rock wall is to be carried out to the requirements of the
                      Shire Engineer.
               23.    All sand excavated from the site surplus to the requirements of the building shall be deposited
                      in an approved manner on the Noosa Main Beach. The building works shall be organised so
                      that contamination of the sand by foreign materials will be minimised. The contractor is
                      required to discuss with the Shire Engineer or Building Surveyor, the proposed means of
                      excavation· prior to any .excavating works proceeding.
               24.    Contributions for roadworks and landscaping shall be payable in accordance with the draft
                      Hastings Street Development Control Plan as follows:-
                      Roadworks and Landscaping - $12,096
                      Such contribution shall be paid prior to the issue of a building permit.




                                                                                                       Page 3 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026

Used in these records

About this file

File size
186 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 51988.2849.05 (As Published).pdf · 186 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.