Minor Change Existing Approval - 51988.2849.05 (As Published)
12. Payment of contributions in accordance with Council's Policy on Water Supply and Sewerage
Headworks, current at the time of Building Approval. Calculations based upon the current
Policy including Price Index variation as at March, 1988 may be obtained from the Engineering
Department upon request.
If payment is not proposed to be made prior to the issue of Building Approval, a cash bond
or trading bank guarantee for the required amount is to be lodged prior to the release of that
Approval. The contribution is then required to be made within fourteen (14) days of the issue
of Building Approval
13. The footpath to the frontage of the site is to be fully paved to the satisfaction of the Shire
Engineer.
14. The developer shall bear the cost of alteration of any public utility or facilities
necessitated by the development of the land or associated construction works external
to the site.
15. Connection to Council's existing water supply and sewerage reticulation systems at the
developer's expense to the standards and requirements of Council's Shire Engineer.
16. Floor levels for all buildings and other structures, car park areas and fill levels for the site
are to be in accordance with the requirements of the Shire Engineer. Such levels shall
be provided on application to the Council's Engineering Department. Any filling or other
development works undertaken on the site shall becarried out so as not to cause the
ponding of water on any adjoining lands and the blockage or interference with any
natural watercourses. No earthworks or filling works are to be undertaken until issue of
a Building Approval.
17. Roof and surface water is to be collected on site and to be discharged through a single
underground drain line into existing drainage in Hastings Street to the satisfaction of the
Shire Engineer.
18. The roof top terrace shall not contain roofing over structures other than clear acrylic
sheeting placed flat over pergolas to prevent entry of stormwater to spa baths. Such
roofing shall be of the minimum size only needed to prevent such entry, to the satisfaction
of the Building Surveyor. The pergolas shall not intrude into a 40 degree slope line from
the outer edge of the building in accordance with the Noosa Design Manual.
19. The applicant shall construct a walkway along the beach frontage to a design approved
by the Shire Engineer. Council may accept a contribution in lieu of these works.
20. Balconies shall be designed and construction so that access and handrails are a minimum
of 1.5 metres setback from the side boundaries.
21. The existing access through the kerb and channel is to be replaced to the requirements
of the Shire Engineer.
22. Strengthening of the existing rock wall is to be carried out to the requirements of the
Shire Engineer.
23. All sand excavated from the site surplus to the requirements of the building shall be deposited
in an approved manner on the Noosa Main Beach. The building works shall be organised so
that contamination of the sand by foreign materials will be minimised. The contractor is
required to discuss with the Shire Engineer or Building Surveyor, the proposed means of
excavation· prior to any .excavating works proceeding.
24. Contributions for roadworks and landscaping shall be payable in accordance with the draft
Hastings Street Development Control Plan as follows:-
Roadworks and Landscaping - $12,096
Such contribution shall be paid prior to the issue of a building permit.
Page 3 of 10
Document Set ID: 24838539
Version: 5, Version Date: 05/06/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 51988.2849.05 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 186 KB (small file)
- File type
No other editions are linked here.