Council archive · source document
Compiled Decision Notice 132002.220611.4 14 Serenity Cl Noosa Heads
132002.220611.4
In addition, the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at
the Land Titles Office and any additional Titles Office forms or requisitions requiring the
consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to
the use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
Should the subject site (Lot 8 on SP195871) be amalgamated with the adjoining site (Lot
7 on SP195871) the requirement for the access and services easement shall not apply.
Additional Condition (21/12/2011) (71-79)
71. Construction activities must not impede the access of Unitywater or Fire Brigade
personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers).
72. The fire-fighting demand on Unitywaters water supply system from the development
must not exceed 15 litres per second.
73. A single Unitywater installed primary water meter must be provided immediately inside
the property boundary. Additional water meters must be installed for each title of a
community title or sub-lease scheme. Meters must be approved by Unitywater, installed
in accordance with Unitywater requirements and remain accessible at all times for
reading and maintenance purposes.
74. The existing Unitywater sewerage infrastructure within Lot 8 must be removed and a
manhole and new sewer connection constructed inside the southern boundary of Lot 8.
75. A 3.0 metre wide easement must be provided over Unitywater sewerage infrastructure
located within private property. Easements must be located centrally over the main.
76. Buildings and other structures must maintain a minimum clearance of 1.0 metre from
sewer manhole chambers and the sewerage inspection opening.
77. Storm water retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.
78. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping
plants within these clearances must be low growing when mature and be suitable
Unitywater approved varieties.
79. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
5 REFERRAL AGENCY CONDITIONS
Not Applicable
6 APPROVED PLANS
Refer to table listed in Condition 1 above
7 PLANS/DOCUMENTS REQUIRING AMENDMENT
Not Applicable
Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Decision Notice 132002.220611.4 14 Serenity Cl Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 70 KB (small file)
- File type
No other editions are linked here.