Compiled Decision Notice 132002.220611.4 14 Serenity Cl Noosa Heads
132002.220611.4
31. The internal driveway (or any other form of hard pavement for that matter) within the drip
zone of any trees on site to be retained shall be designed to allow the flow of water
through the pavement or be designed to direct stormwater runoff to the trees root
system. To this extent the uncovered visitor spaces towards the frontage of the
development may be able to incorporate Grass Rings or a similar device that allows
water penetration.
32. All pavements shall be constructed so as not to damage the root system of any trees to
be retained and in this regard temporary fencing shall be provided around the trees
during construction to help protect them.
33. Plans shall be submitted to the Council for approval that clearly show the type and
extent of pavements proposed, how they comply with the above conditions and also
illustrating any temporary fencing to protect the trees prior to obtaining a Development
Permit for Operational Works.
Frontage Works
34. Footpath improvements such as topsoiling, grassing, and tree planting are required to
the Serenity Close frontage of the site (if not already provided) in accordance with
Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be couch, free of
weeds.
35. A new 1.5 metre wide concrete path shall be constructed along the Serenity Close
frontage of the site (if not already provided) in accordance with Council’s design
standards and to an alignment that protects any significant vegetation or any
underground services.
36. All paths shall be designed and constructed to ensure pedestrian safety using non-slip
materials and to produce an evenly graded surface finish.
Stormwater Drainage
37. A stormwater management plan shall be prepared by a RPEQ, specialising in
stormwater and water quality management incorporating the principles of the
Environmental Management Plan for the Settlers Cove Development 23118 DA, that
demonstrates water reuse strategies, infrastructure capacity and effective treatment
methodology. The use of rainwater harvesting tanks for irrigation purposes shall be
incorporated in the overall design plans. These plans shall be submitted to Council for
approval prior to obtaining a Development Permit for Operational Works.
38. All stormwater drainage shall be collected on site and discharged so there is no net
increase in stormwater runoff from the site.
39. On site swale drains will be required to capture and direct any overland stormwater
runoff to the Infiltration Pits proposed on site. These swales shall be sized to carry a 3-
month storm event and plans detailing their capacity, location, length, width and grades
shall be submitted to Council for approval.
40. To ensure polluted run-off does not enter any of the proposed Infiltration Pits, and
ultimately the water table, stormwater run-off from the carparking areas and the
driveways shall have the first flush (the first 12 mm of rainfall or hose-down) collected in
a grease/oil arrestor (or similar device) provided on site prior to discharging into the
infiltration pits.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
arrestors, which shall be submitted to the Council for approval prior to obtaining a
Development Permit for Operational Works.
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council’s records
prior to commencement of the approved Use.
Page 6 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Decision Notice 132002.220611.4 14 Serenity Cl Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 70 KB (small file)
- File type
No other editions are linked here.