Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Appendix F Bushfire Management Plan

of 53

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
8.0 Assessment of proposal against the Noosa Plan (2020) Part
    8.2.3.
 Performance Outcomes                           Acceptable Outcomes
 8.1(PO1)
 Development maintains the safety               AO1.1 is applied to the extent that the proposed development
 of people and property from the                does not significantly increase the number of people living in a
 adverse impacts of bushfire.                   bushfire hazard area.

                                                AO1.2 is applied to the extent that a minimum setback has been
                                                established for any future dwelling, and the mitigation measures
                                                outlined in this BMP are applied, such that bushfire risk is reduced
                                                to an acceptable level.

 8.2 (PO2)
 Bushfire mitigation measures do not            Bushfire mitigation measures do not adversely impact on:
 adversely impact on:                              (a) Biodiversity values, connectivity and ecosystem
     (a) Biodiversity values,                           functioning; and
         connectivity and ecosystem                (b) The long term physical integrity of waterways, wetland
         functioning; and                               and areas of native vegetation.
     (b) The long term physical
         integrity of waterways,
         wetland and areas of native
         vegetation.

 8.3 (PO3)
 Development provides an adequate               AO3.1 is applied in that premises are connected to the reticulated
 water supply for fire fighting                 water supply.
 purposes which is reliable, safely
 located and freely accessible.

 8.4 (PO4)
 Essential community infrastructure             The proposed development does not involve essential community
 is acle to function effectively during         infrastructure.
 and immediately after bushfire
 events.

 8.5 (PO5)
 Public safety and the environment              Hazardous materials are not manufactured or stored in bulk on
 are not adversely affected by the              the site.
 detrimental impacts of bushfire on
 hazardous materials manufactured
 or stored in bulk.

 8.6 (PO6)
 Roads provide for easy and safe                The existing roadways and new driveway provide options for
 evacuation of residents of premises            access and egress in a safe direction.
 and access by emergency services.



Report compiled by Bushfire Risk Reducers for Mr K. Courtney, January 2021                        Page 19
Log in to download the original file

Appendix F Bushfire Management Plan.pdf · 6.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.