Cover Letter - Response to Information Request

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Information Required

2.      Provide additional comment on the suitability of the proposed ‘Occasional parking
        HRV/MRV’ zone to function as a loading bay for a semi-trailer (15m x 3.6m) to serve all of
        the proposed tenancies.

3.      Provide an additional plan demonstrating how the carpark will function for vehicles entering
        and exiting the carpark while the loading bay is occupied. The additional plan must be
        prepared by a suitably qualified person (RPEQ – Registered Professional Engineer of
        Queensland).

4.      Provide additional detail demonstrating the location of the proposed staff carparks. Note
        that no patron carparks should be inaccessible while the loading bay is occupied.

Response

Please refer to the enclosed cover letter response and revised civil engineering plans prepared by
Recor which address items 2 – 4.


Issue – Stormwater Infrastructure on Gateway Drive

Council have identified that the proposed driveway crossover will impede on an existing stormwater
structure along Gateway Drive. Council are concerned that the location of the proposed driveway
crossover will create worsening of conditions and functionality of the existing drainage system
associated with the structure.


Note that Council is unlikely to support the submitted driveway crossover.

Information Required

5.      Provide an amended plan demonstrating how the proposed driveway crossover will
        avoid creating worsening of conditions for the existing stormwater drainage system along
        Gateway Drive. The amended plan must be prepared by a suitably qualified person (RPEQ –
        Registered Professional Engineer of Queensland) and include, but not be limited to:
        a.      a design generally in accordance with RS-051 and any associated addendum.


Response

Please refer to enclosed cover letter response and revised civil engineering plans prepared by Recor
which address item 5.


Issue – Stormwater Management Plan

Council are concerned regarding the functionality of the stormwater management plan and the
neighbouring detention basin towards the end of the development’s life span. Council predict that
the yearly average rainfall will increase by approximately 20% towards the end of the development’s
life span (2100).
Log in to download the original file

Cover Letter - Response to Information Request.pdf · 160 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.