Assessment Managers Conditions:
General:
Pursuant to the provisions of the Planning Act 2016 and the Building Act 1975,
permission to undertake the building work as outlined above is subject to the
following conditions:
1. All works subject to this approval are to be completed, inclusive of
satisfactory final inspection and submission of all
certificates/documentation, no later than six (6) months after the date of
approval or this approval will lapse. Where lapsing occurs, a new
Development Approval will be required to continue or finalise the
assessable development and such approval may require compliance with
any subsequent legislative amendments.
2. All building work shall comply with the Building Act 1975 and the
Conditions of this Decision Notice and shall be in accordance with the
approved plans and specifications including any amendments or
conditions shown in red. All conditions must be satisfied prior to the issue
of Form 21- Final Inspection Certificate.
Inspections will be undertaken in accordance with the guidelines for the
inspection of Class 1a and 10 Buildings and Structures as published by
Department of Infrastructure and Planning dated December 2011.
MANDATORY INSPECTION STAGE UNDERTAKEN BY
Final, on completion of all works relating to this approval. Noosa Council
As may be required by the Building Certifier. Noosa Council
Local Authority Infrastructure:
3. All Services that may be affected by this construction shall be accurately
located for alignment and/or depth prior to commencement of works.
Where sewer or stormwater access chambers are located within the
property they are to remain uncovered and accessible during and after
construction. Should difficulty arise in locating any service please
contact the relevant authority.
Building – General
4. Any excavation work required to remove footings or similar must be
back filled and graded to natural surface level in such a manner as to
prevent the ponding of water. All other excavation and filling is expressly
prohibited.
5. At the completion of works, the site is to be left clear of building
materials and demolition waste and is to be in a tidy state with the
complete removal of relevant structures to ground level (inclusive of
footings).
6. Demolition waste must be disposed of in accordance with the
requirements of the Noosa Council. Regulated waste (e.g. Asbestos)
may require special disposal arrangements.
7. This approval does not authorise removal or damage to infrastructure
(kerb and channel, driveways etc.) or vegetation within or adjacent to
the subject property (including street trees).
Codes of Self Assessable Development
Page 3 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.