Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

6. Volume 3 - Civil Engineering Services Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application - Landscaping Concept & Civil Engineering report (email 2 of 3).

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

office



EXISTING SERVICES CODE
 SPECIFIC OUTCOMES                     PROBABLE SOLUTIONS                          RESPONSE

 Setbacks and easements                S1.1

 O1                                    The footing of any structure or             The proposed development will not
                                       building is located clear of the zone       impact on existing services.
 Development near a sewer, water       of influence but no closer than 1.5m
 main, stormwater drain, overland flow (measured horizontally) from           Refer to Engineering Services Report
 path or associated structure does     infrastructure including sewers, water B16239CR001 and Stormwater
 not—                                  mains and stormwater structures;            Management Plan B16239CR002
                                                                                   prepared by Lambert & Rehbein.
(a) adversely affect the function of the AND
    service;
(b) place an additional load on the    S1.2
      service; and
                                       No building or structure overhangs
(c) unduly increase future             the zone of influence;
      maintenance costs.
                                       AND

                                       S1.3

                                       Finished surface levels maintain a
                                       minimum of 600mm of cover, but no
                                       greater than 3m of cover to the
                                       underground infrastructure;

                                       AND

                                       S1.4

                                       If the existing surface level is altered,
                                       surface level services including
                                       manholes and inspection points are
                                       altered to match the new surface
                                       level;

                                       AND

                                       S1.5

                                       Alterations are constructed in
                                       accordance withPSP6 –Engineering
                                       Design Standards — Water and
                                       Sewerage and Section 4 of PSP5 –
                                       Engineering Design Standards –
                                       Roads, Drainage and Earthworks;

                                       OR

                                       S1.6

                                       Existing services are relocated and
                                       the design and construction of the




                                                          i
Log in to download the original file

6. Volume 3 - Civil Engineering Services Report.pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.