Attachment 8 - Working draft - Deed of Variation to IA - 02.12.2019
Deed of Variation
a. design and construct the New Public Road (or any part not yet constructed) in accordance
with the conditions imposed on any approval; and
b. dedicate any land required for the New Public Road.”
9. Insertion of a new clause 6.9 as follows:
“6.9 Pedestrian Thoroughfare Easement
If the Reconfiguration of a Lot Application is approved and the approval takes effect, the
Applicant shall, at no cost to Council, grant the Pedestrian Thoroughfare Easement to Council
on terms satisfactory to both parties and in accordance with the conditions imposed on any
approval.”
10. Insertion of a new Part 6A as follows:
“6A Emergency bushfire access to Walter Hay Drive
If the Reconfiguration of a Lot Application is approved and the approval takes effect, the
Applicant shall, at no cost to Council, provide an emergency bushfire access to Walter Hay
Drive on terms satisfactory to both parties and in accordance with the conditions imposed on
any approval.”
11. Insertion of a new clause 7.3 as follows:
“7.3 Dedication of Transit Lot 24
a. If the Reconfiguration of a Lot Application is approved and the approval takes effect, the
Applicant shall, at no cost to Council, dedicate the land described as Transit Lot 24.
b. For the avoidance of any doubt:
i. Stockwell is not required to construct the transit centre facility on Transit Lot 24;
ii. All carparking required to deliver development on Transit Lot 24 is contained on
that land.
12. Insertion of a new clause 10.6 as follows:
“10.6 Development Intensity
For the avoidance of doubt, the parties acknowledge that:
a. The Draft Framework and Character Plan identifies different uses in different precincts to
those shown on Master Plan 2 (which, in this clause, is taken to be a reference to Master
Plan 2 without incorporating the amendments shown on the Draft Framework and
Character Plan);
b. The intensity of development contemplated by the Draft Framework and Character Plan
does not exceed the intensity of development contemplated by Master Plan 2.”
HopgoodGanim Lawyers Page 9 of 10