                                                                                                                             Tectonic Geotechnical Pty Ltd
                                                                                                                             PO Box 899
                                                                                                                             Buderim Qld 4556
                                                                                                                             Ph: 07 5478 9016

                                                                                                                         PROJECT:
                                                              DCP6              BH6
                                                                                                                         STAGE 5 GEOTECHNICAL
                                                                                                                         INVESTIGATIONS

                                                                   BH7
                                                                                        BH3                              TITLE:
                                                                                                  BH11
                                                                                                                         SITE PLAN


                                                                                                                         CLIENT:
                                                                                                         BH1
                                                                                                                         CBD SETTLERS COVE PTY LTD


                                                      BH9          BH8                                                   DRAWN:                  DATE:
                                                                                      BH4
                                                                                                                         MCC                       16/08/2022
                                                                                                         BH2             CHECKED:                DATE:

                                                                         BH10                                   BH12     ACD                       16/08/2022
                                                                                            BH5                          SCALE:
                                                                                                                         AS SHOWN (APPROX.)
                                                                                                                         LEGEND:


                                                              Subject Site                                                         APPROX. PREVIOUS
                                                                                                                                   BOREHOLE LOCATIONS (2021)

                                                                                                                                   APPROX. PREVIOUS
                                                                                                                                   STANDSLONE DCP LOCATION
                                                                                                                                   (2021)

                                                                                                                                   APPROX. ADDITIONAL
                                                                                                                                   BOREHOLE LOCATIONS (2022)
Notes:
Base plan adopted from Nearmap imagery dated 10 September 2021 &
ALTA Projects Drawing No. A6107/21/L901 Rev A, dated August 2021                                    0m     20      40m   PROJECT NO.:          FIGURE:       REV:

                                                                                                                             19009-004                1         0

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

19009-004-Rev0 RIP Advice.pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.