Log in to see the plans as drawn EWSM- 2 WASTE MANAGEMENT
Version 1
EWSM- 2 WASTE MANAGEMENT
Hierarchy of Control (HOC): 1. Eliminate 2. Substitute 3. Isolate 4. Engineer 5. Admin 6. PPE
Responsible Person/s
Environmental Aspects Impacts HOC Controls / Work Methods
for Monitor & Review
Prior to site establishment Unexpected cost for waste disposal 5 Waste streams: identify which waste streams are likely to be Project Manager
generated and estimate the approximate amounts of material
Possible contamination by hazardous materials like asbestos or lead:
these materials will limit reuse /recycling options and require special
disposal
Focus on waste avoidance: instead of managing the waste once it has
been generated, look at ways to avoid the generation of that waste in
the first place
Services: select an appropriately qualified waste management
contractor who will provide services for the waste streams generated
and data on waste/recycling generation;
Check if washout bay (i.e. concrete, paint, plaster) is permitted on site.
Where work site is close to natural watercourse, washout bay is
unlikely acceptable.
Check if work site is on Fire Ant Restricted Areas
Check if work site is on Acid Sulfate Risk Areas
No burning off waste is permitted
Site establishment and Unsustainable practice 5 Where practical, waste should be segregated into recycling materials Project Manager
management (steel, cardboards, timber, construction materials) Site Manager
Bins must be clearly and correctly labelled HSE Advisor
Vermin must be prevented from entering waste areas and containers.
Potential cause of pest outbreaks Site will be maintained in a tidy state free of litter and rubbish
Site establishment Inadequate liquid waste storage 1 Liquid waste (effluent) will be stored in appropriate containers in Project Manager
and contained causing significant 5 bunded areas (or an equivalent purpose-built bunding device) until Site Manager
environmental harm transported off-site.
Roof water is not connected to the effluent tank
The capacity of the spillage containment compound shall be at least
100% of the volume of the largest package plus 25% of the storage
capacity up to 10,000 L, together with 10% of the storage capacity
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.