24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                    EWSM- 3 PEST CONTROL AND FAUNA MANAGEMENT
                                                                                                                                                                       Version 1



EWSM- 3 PEST CONTROL AND FAUNA MANAGEMENT
Hierarchy of Control (HOC): 1. Eliminate 2. Substitute 3. Isolate 4. Engineer 5. Admin 6. PPE


                                                                                                                                                                   Responsible Person/s for
    Environmental Aspects                          Impacts                    HOC                           Controls / Work Methods
                                                                                                                                                                      Monitor & Review

Prior to site establishment, check   Adverse environmental harm on             5     Before clearing, removing vegetation, or lopping trees, ensure the           Project Manager/
for permit for clearance or remove   fauna and fauna habitat loss                     project has obtained all permit to clear.                                    Environmental Consultant
vegetation                                                                           Where required by the Environmental Protection Authority, a survey of
                                                                                      the area to be cleared should be carried out by an ecologist, prior to
                                                                                      clearing any vegetation.
Planning works                       Misidentify clearing zone                 5     Clearly and accurately define the legal external boundary of you             Project Manager
                                                                                      property and the public land.                                                Site Manager
                                     Not minimising the environmental          5     Provision of habitat via landscaping species selection, retention of logs,   Project Manager/
                                     impacts on fauna and their habitat               drainage design                                                              Environmental Consultant
                                                                                     Features to facilitate fauna movement across, over or under sites if
                                                                                      required
                                                                                     Knock tree trunks 24 hours prior to removal to encourage fauna to
                                                                                      escape
                                     Misidentify a native fauna and their      5     Listing any Endangered, Vulnerable, Near Threatened (EVNT) species           HSE Advisor
                                     habitat                                          or habitat trees that are to be protected and retained on an appropriate
                                                                                      project register
                                     Causing harm to the native fauna,               Providing photographs and information on site notice boards showing
                                     their living environment/ habitat by             local fauna and pests known to occur in the area
                                     lacking of knowledge                            Providing ongoing training (e.g. toolbox talks and pre-start briefings) in
                                                                                      response to fauna sightings, fauna related incidents, or as a result of
                                                                                      changing project conditions
Site establishment                   Mass soil loss during significant rain    5     Clearing work should be staged to minimise the duration for which soils      Site Manager
                                     events has direct impact on fauna                are exposed to wind, rain and concentrated runoff
                                     habitat                                         Clearing zone is protected by erosion and sediment control measures
                                     Changing living habitat of               5      Minimising impacts of lighting during construction                           Site Manager
                                     surrounding construction site                                                                                                 HSE Advisor
                                     Delay in wildlife emergency               5     Display contact details of local fauna handler (e.g. RSPCA) on site          HSE Advisor
                                     response                                         notice board


                                                                                                                                                                                              1
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.