24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn EWSM- 4 VEGETATION AND WEED MANAGEMENT
Version 1
Hierarchy of Control (HOC): 1. Eliminate 2. Substitute 3. Isolate 4. Engineer 5. Admin 6. PPE
Responsible Person/s for
Environmental Aspects Impacts HOC Controls / Work Methods
Monitor & Review
Ensure that there is no encroachment of construction/building works
within identified Tree Protection Zones. No root in excess of 25mm
diameter should be disturbed within these protection zones
Protecting tree root systems Damage tree root systems 5 Ensure that where it is essential to cut the roots of the Site Manager
protected/retained trees, that the roots are:
- Cut with a water lance, or cut while they are underwater to Professional tree remover
minimise air intrusion into the roots; and/or
- Cut in stages over a period of days to allow tree roots to repair
and adapt
Managing weed Increase new infested areas 5 Ensure plant, equipment and clothing are free of soil and vegetative Foreman
matter prior to being brought to site HSE Advisor
Cross contaminated soil 1 Separate weed infested soils from clean soils Foreman
HSE Advisor
Rehabilitation Environmental harm caused by 5 All reasonable and practicable steps are taken to: Project Manager
erosion and soil loss - incorporate all necessary site rehabilitation measures into the Site Manager
building contract such that these works will be completed before the
end of the contracted works; and/or
- coordinate, facilitate and expedite the prompt rehabilitation of
finished earthworks with the land owner and/or external contractors
**A suitably qualified and experienced professional is defined as a person with:
Training and/or qualifications in erosion and sediment control that are recognised by the assessing authority; and
Professional affiliations with an engineering, environmental engineering, soil science, and/or scientific organisation and
At least 2 years experience in the management of erosion and sediment control which can be verified by an independent third party
Developed / approved and communicated to all relevant workers on site by:
Name: Position: Date:
Matt Leeke / Terry Strahan / Jesse Joyce Site Manager/ Foreman
Workers Representative
Project: 24647 71 Seaview Terrace Sunshine Beach Q 4567
4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.