24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Sediment Basin Spillway Design Information
Peak Flow
Qy = (Cy x Itc,y x A)/360         Equation 1 (IECA 2008)
Where:
Qy=                  Peak flow rate (m3/s) of average recurrence interval (ARI) of Y years
Cy=                  runoff coefficient (dimensionless) for ARI of Y years                                                                                                                                                                                                                                                                                         Job No. 17SUN-0024
Itc,y=               Average rainfall intensity (mm/hr) for design duration of tc hours and ARI of Y years.                                                                                                                                                                                                                                                          Client HUTCHINSON
A=                   Area of catchments (ha)                                                                                                                                                                                                                                                                                                                            Job 71 SEAVIEW TERRACE
360=                 Conversion Factor                                                                                                                                                                                                                                                                                                                                Date 3/8/2016

Wier (Minor friction loss over spillway crest and approach channel)                                             Refer to Figure 1
Water level in sediment basin solved using equation below using trail and error.
Q = 1.7bH1.5 + 1.26mH2.5         Equation 2 (IECA 2008)                                                                                                                                                                          H
                                                                                                                                                               1
Where
Q=                   Peak flow rate (m3/s) of average recurrence interval (ARI) of Y years (calculated using Equation 1)
b=                   Base width of wier                                                                                                                                   m
H=                   Water level within Sediment Basin relative to spillway (weir) crest (m)
                                                                                                                                                                                                                         b
                                                                                                                                                                                                    Figure 1 Wier Profile
Chute                                                                                                           Refer to Figure 2
Flow height is solved by trial and error using the three equations below as per IECA 2008.
Q = 1/n x A x R2/3 x S1/2          Equation 3 (IECA 2008)
Where
Q=                   Peak flow rate (m3/s) of average recurrence interval (ARI) of Y years
n=                   Mannings coefficieint (unitless)
A=                   Cross sectional area of flow (m2), refer to Eqaution 4
R=                   Hydraulic Radius (m), refer to Equation 5
S=                   Slope of energy line, equal to slope of chanel bed (m/m)

A = (b + xy)y                     Equation 4 (IECA 2008)
Where
A=                   Cross sectional area of flow (m2)
b=                   Base width of channel (m)
x=                   side slope of channel
y=                   depth of flow in channel (m) + required 0.30m freeboard

R = ((b + xy)y) / (b+2y(1+x2)1/2) Equation 5 (IECA 2008)
Where
R=                   Hydraulic radius of flow (m)                                                                                                Figure 2 Cross-section of Chute
b=                   Base width of channel (m)
x=                   side slope of channel
y=                   depth of flow in channel (m) + required 0.30m freeboard

Energy Dissipator                                                                                               Refer to Figure 3
d50                  Median Rock Diametre (mm) Table 5 of IECA 2008 Fact Sheet "Chutes Part 1"                                                                                                                                                                                      Figure 3 Energy Dissipator
W1=                  Width 1 (m)=(b+2xy)+0.6
W2=                  Width 2 (m)=(b+2xy)+0.4L
L=                   Length of dissipator (m) Table 6 of IECA 2008 Fact Sheet "Chutes Part 1"                                                                                                             R calculation & Velocity Check
                                                                                                                                                        Base            Batter          Depth                     Area (m²)      P (m)      R                      D50         Velocity           Max V
                                                                                                                                           Total Site (compacted)   5               2                      0.021        0.105882 5.09391486                 0.02         200               1.78               2.23
                                                                                                                                                        0           0               2             #N/A                  #N/A               #N/A         #N/A             200       #N/A                       2.23
                                                                                                                                                        0           0               2             #N/A                  #N/A               #N/A         #N/A             200       #N/A                       2.23
                                                                                                                                                        0           0               0                       0.000                    0             0   #DIV/0!           200               0.00               2.23




                                   Peak Flow (Entering Basin)                                                 Wier                                                                                                      Chute                                                                                                                 Energy Disipator
                                                                                                                                Minimum                                                                                                                       Required
                                                                                                                 Upstream                                                                                                                                       Chute    Maximum
                                                                                                Horizontal                     Height with
                                                                                 Base width                      water level               Channel                       Channel                                                                             Depth with Permissable
 Sediment Basin                                                                                  Slope of                        0.30m
                                                                                    (m)                          relative to
     Label                  C50     Itc,y      Tc         A           Q20
                                                                                                   Wier                        Freeboard Base Width Side Slope            Slope                                                                      Flow      300mm      Velocity                  Velocity         Mean rock size, d50
                                                                                                                  Wier (m)                   (m)      Length              (m/m)         Proposed Lining              Mannings            Peak Flow Depth (m) Feeboard      (m/s)                     (m/s)                 (mm)            Width 1 (m)     Width 2 (m)       Length (m)
                                                                                                                                   (m)
                                                                                                                                  H+
                                                                                       b             m                H
                                                                                                                               freeboard        b              x              So                                             n              Q             y         y+0.3m         Vmax                   V                 d50                W1                 W2              L
Total Site (compacted) 1.012        291        5              0.23    0.19           5.00           2.00             0.07         0.37         5.00            2           0.2500       Coir Mat TMC7                  0.0220              0.188       0.021         0.321          3.30             1.78                 100.000             5.684              5.484          1.000
                                                                                                                       -        #VALUE!        0.00            2           0.2500       Rock R200, D100 (0.5)          0.0600              0.000       #N/A          #N/A           1.58             #N/A                  #N/A               #N/A               #N/A           #N/A
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.