24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnAsset I.D. DA No.
System location:
Area: Catchment Area (ha): Bioretention Area (ha):
Civil drawing no.
Landscape drawing
no.
Role/Stakeholder Company Contact Name Contact Details
Developer
Site superintendent
(civil)
Site superintendent
(landscape)
Bioretention designer
Civil engineer
Landscape architect
Civil contractor
Landscape contractor
Council compliance
officer
Checklist of Sign-Off Forms
Date Name of Signatory & Role
Sign-Off Form Signature
Completed (e.g. Superintendent)
Pre-Start Meeting
Form A — Earthworks &
Functional Structures
Form B — Under-Drainage
Form C — Bioretention Media
Form D — Finished Levels
Form E — Coarse Sediment
Forebay
Form F — Protective
Measures
Form G — Landscape
Installation
Form H — Landscape
Establishment
CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
SYSTEMS 2
© South East Queensland Healthy Waterways Partnership 2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.