Skip to the record
The only place to find full transcripts.

Original source · versioned page text

24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Option 2 — Bypass and early                                                                Action (if
                                                Checked            Satisfactory                                             Initial
establishment                                                                              unsatisfactory)
Continuous sediment fences installed
around perimeter of filter media and top of
batter.
Where landscape works are not to
commence immediately then cover batters
with filter cloth.
Temporary bund installed (where required)
to prevent stormwater runoff from entering
bulk of system. Bund keyed into batters of
bioretention and crest level higher than pits
and weirs.
Temporary protective covering (filter cloth
+ 25 mm topsoil + turf) installed within
bunded area.
Option 3 – Sediment Basin and                                                              Action (if
                                                Checked            Satisfactory                                             Initial
Bioretention Function                                                                      unsatisfactory)
Continuous sediment fences installed
around perimeter of filter media and top of
batter.
Sediment basin installed upstream of
bioretention in accordance with either
(hydraulic structure):
   WSUD Technical Design Guidelines
    for SEQ (SEQHWP, 2006)
   Local erosion and sediment control
    guidelines or Best Practice Erosion
    and Sediment Control (IECA, 2008).
Suitable access provided to sediment
basin for clean out.
Bioretention system installed downstream
of sediment basin.
Protective covering (filter cloth, 25mm top
soil and turf) installed across entire filter
media area of basin.

HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding.

Comments (attach and refer to additional pages if necessary)




NB: Photos attached.


Signed by superintendent:


                              CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
                                                                                  SYSTEMS                                       10

                                                               © South East Queensland Healthy Waterways Partnership 2010
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.