Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Plants successfully established
plants propagation is occurring.
Measure of successful
establishment
1. Survivorship greater than 90%
2. 80% coverage of system
3. Preferably more than one
    species per macrophyte zone
4. At least 5 plants/m2 (preferably
    6–10 plants/m2)
5. Plant height of at least 50%.
    This can be measures through
    the use of marker or stakes
    through the bioretention
6. Propagation is occurring (more
    than 2–3 stems, seeding)
7. No weeds.
Growth and maturity should be
recorded through three-monthly
photo logs every 500 m2.

HOLD POINT: Superintendent AND bioretention designer inspection and sign-off.

Comments (attach and refer to additional pages if necessary)




NB: As constructed drawings and photos attached.


Signed by superintendent:
Print name:
Date:
AND
Signed by bioretention designer:
Print name:
Date:




                            CONSTRUCTION AND ESTABLISHMENT SIGN-OFF FORMS – BIORETENTION
                                                                                SYSTEMS                                     13

                                                               © South East Queensland Healthy Waterways Partnership 2010
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.