24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Environmental Management Plan
24647 – 71 SEAVIEW TCE SUNSHINE BEACH


Contents

Preface                                                                       4

Glossary                                                                      5

1.    Environmental Policy Statement                                          6

2.    Introduction                                                            7

2.1   Purpose                                                                 7
2.2   Project Scope and Description                                           8
2.3   Structure of the Environmental Management Plan                          8
2.4   Related documents                                                       9

3.    Responsibilities                                                        9

3.1   On-site Environmental Responsibilities (EMSM Section 5)                  9
3.2   Sub-contractor requirements                                             10

4.    Relevant Legislation & Standards (EMSM 6.2.3)                           11

4.1   Licences, Permits and Consents                                          11
4.2   Relevant Guidelines and Standards (EMSM Section 6.2.5)                  11
4.3   Environmental Sampling and Laboratory Analysis                          11

5.    Environmental Aspects                                                   11

5.1   Site Risk Assessment (EMSM 6.2.1)                                       11
5.2   Sub-contracted activities                                               12
5.3   Sustainable Procurement                                                 12
5.4   Environmental Management Measures                                       12
5.5   Emergency Planning and Response (Section 6.3.7)                         12

6.    Training, Awareness & Competency (EMSM Section 6.3.2)                   13

6.1   Induction                                                               13
6.2   Environmental training                                                  13
6.3   Toolbox Training (EMSM 6.3.3)                                           14

7.    Communication & Reporting (EMSM Section 6.3.3)                          14

7.1   Internal communications and reporting pathways                          14
7.2   External stakeholders                                                   14
7.3   Routine reporting                                                       14
7.4   Internal reporting – hazards, non-conformance and corrective action     14
7.5   Incident and corrective action reporting to the Principal               15
7.6   Reporting incidents to regulatory authorities                           15
7.7   Complaints and complaints response                                      15

8.    Record Keeping & Document Control (EMSM Section 6.3.4)                  15

9.    Monitoring & Review Of Environmental Performance (EMSM Section 6.4.1)   16

9.1   Monitoring and Meetings                                                 16
9.2   Environmental Work Method Statements (EMSM Section 6.2.1)               16
9.3   Internal Auditing (EMSM Section 6.4.4)                                  17



HUTCHINSON BUILDERS                                                           2
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.