Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEnvironmental Management Plan 24647 – 71 SEAVIEW TCE SUNSHINE BEACH Contents Preface 4 Glossary 5 1. Environmental Policy Statement 6 2. Introduction 7 2.1 Purpose 7 2.2 Project Scope and Description 8 2.3 Structure of the Environmental Management Plan 8 2.4 Related documents 9 3. Responsibilities 9 3.1 On-site Environmental Responsibilities (EMSM Section 5) 9 3.2 Sub-contractor requirements 10 4. Relevant Legislation & Standards (EMSM 6.2.3) 11 4.1 Licences, Permits and Consents 11 4.2 Relevant Guidelines and Standards (EMSM Section 6.2.5) 11 4.3 Environmental Sampling and Laboratory Analysis 11 5. Environmental Aspects 11 5.1 Site Risk Assessment (EMSM 6.2.1) 11 5.2 Sub-contracted activities 12 5.3 Sustainable Procurement 12 5.4 Environmental Management Measures 12 5.5 Emergency Planning and Response (Section 6.3.7) 12 6. Training, Awareness & Competency (EMSM Section 6.3.2) 13 6.1 Induction 13 6.2 Environmental training 13 6.3 Toolbox Training (EMSM 6.3.3) 14 7. Communication & Reporting (EMSM Section 6.3.3) 14 7.1 Internal communications and reporting pathways 14 7.2 External stakeholders 14 7.3 Routine reporting 14 7.4 Internal reporting – hazards, non-conformance and corrective action 14 7.5 Incident and corrective action reporting to the Principal 15 7.6 Reporting incidents to regulatory authorities 15 7.7 Complaints and complaints response 15 8. Record Keeping & Document Control (EMSM Section 6.3.4) 15 9. Monitoring & Review Of Environmental Performance (EMSM Section 6.4.1) 16 9.1 Monitoring and Meetings 16 9.2 Environmental Work Method Statements (EMSM Section 6.2.1) 16 9.3 Internal Auditing (EMSM Section 6.4.4) 17 HUTCHINSON BUILDERS 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.