Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnWaste Management Plan
Job No. 24647 - 71 Seaview Terrace Sunshine Beach Qld 4567
1. INTRODUCTION
The purpose of the Waste Management Plan (referred to as WMP) is to describe the measures that the Hutchinson Builders
will utilise to identify the waste streams and tailor work activities to minimise the generation of waste and manage it
appropriately at 71 Seaview Terrace, Sunshine Beach Qld 4567.
The WMP objective is to ensure construction activities are carried out in a manner that will:
Minimise waste generation to landfills and maximise waste material avoidance, reuse and recycling;
Increase the awareness of all employees and subcontractor employees to ensure they understand their
responsibilities for waste management; and
Comply with all relevant legislation and regulatory requirements relating to waste minimisation and waste
management.
The WMP provides the following:
Legislative framework;
Responsibilities for implementation of the WMP including overseeing waste management practices including
training, supervision, reporting and auditing during the Contract works;
Nomination of licensed contractor for recycling and the timing of collection services;
Waste management targets and the means for achieving these;
Waste management methods;
Site plan including location of waste management facilities;
Measurement techniques for the volume and weight of each material (totals and amounts disposed of, recycled
or re-used); and
Monitoring, reporting and auditing procedures.
2. DOCUMENT TERMS AND DEFINITIONS
Table 1: Terms and Definitions
Term Definition
Environment Environment includes:
(a) ecosystems and their constituent parts, including people and communities; and
(b) all natural and physical resources; and
(c) the qualities and characteristics of locations, places and areas, however large or
small, that contribute to their biological diversity and integrity, intrinsic or attributed
scientific value or interest, amenity, harmony and sense of community; and
(d) the social, economic, aesthetic and cultural conditions that affect, or are affected by,
things mentioned in paragraphs (a) to (c).
HUTCHINSON BUILDERS 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.