Skip to the record
Beware of cheap imitations.

Original source · versioned page text

24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Waste Management Plan
Job No. 24647 - 71 Seaview Terrace Sunshine Beach Qld 4567




      8. WASTE MANAGEMENT MONITORING AND AUDITING
         PROCEDURES

8.1           WASTE MONITORING, AUDITING AND REVIEW
The site HSE Officer shall complete Weekly HSE Inspection – BIG 8 HB-HSEQ-F-048 site manager for review. In
addition, the waste contractor will provide monthly reports providing a breakdown of the weights of recyclable/ non-
recyclable materials and of non-recyclable waste as a percentage of the total. The project will review the performance on
a quarterly basis against the Project Performance Measures HB-HSEQ-F-050.


8.2           ENVIRONMENTAL INCIDENTS
All environmental incidents shall be reported on then Incident / Injury / Hazard Report Form HB-HSEQ-F-027-B and
reported to the relevant management personnel in accordance with EMP – Incident and corrective action reporting.
Corrective action will be undertaken in accordance with the recommendations of the Site Management and waste
management processes reviewed where required.


8.3           WASTE MANAGEMENT PLAN UPDATE AND REVIEW
This WMP will be reviewed regular intervals not exceeding 6 monthly or where there is significant change to the project.




HUTCHINSON BUILDERS                                                                                                   15
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.