24647 Seaview Tce Enviro Mgmt Plan

Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).

of 212

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
List of Referenced Legislation & Codes of Practice – Environment
HB-HSEQ-F-005-A Version 5
              Issue             Applicable Legislation / Guidelines / Standards      Regulating                      Major Requirements of Legislation
                                                                                     Authority
  Acid Sulfate Soils           State Planning Policy (SP2/02) Guideline for            DEHP          Correct management of acid sulphate soils (ASS). See ASS
                               Planning and Managing Development Involving                            Management Plan if provided.
                               Acid Sulfate Soils
                               Queensland Acid Sulfate Soil Techical Manual –
                               Soil Management Guidelines v4.0
  Fire ants                    Plant Protection Act 1989 Qld and Plant Protection      DEHP          Work site within Restricted Areas require initial site inspection for
                               Regulation 2002 Qld                                                    visual free of Fire Ants.
                                                                                                     Any movement of Restricted items will require record of receipts/
                                                                                                      delivery dockets
  Waste Management
  Disposal of waste from       Waste reduction & Recycling Act & Regulation            DEHP          Section 19 of the policy outlines the requirements of a waste
  building sites               2011                                                                   management program such as the activities that may generate waste
  Management of Excavated      Waste reduction & Recycling Act & Regulation            DEHP          Minimisation of waste generated
  Material                     2011                                                                  Ensure the correct storage of waste and segregation of different
                                                                                                      waste materials.
  Water Management
  Water Use                    Environmental Protection (Water) Policy              DEHP             No releases of substances to surface waters, groundwater or
                               2009 QLD                                                               stormwater e.g. cement, building waste, rubbish, hydrocarbons, etc.
                               Best Practice Erosion & Sediment                                       unless authorised by an Environmental Authority, Development
                               Control 2008                                                           Approval
  Surface Water Discharge      Environmental Protection (Water) Policy              DEHP             No releases of substances to surface waters, groundwater or
                               2009                                                                   stormwater e.g. cement, building waste, rubbish, hydrocarbons, etc.
                               Best Practice Erosion & Sediment                                       unless authorised by an Environmental Authority, Development
                               Control 2008                                                           Approval.
                                                                                                     No releases of stormwater off-site into a stormwater drain which results
                                                                                                      in the build-up of sand, silt or mud; or the deposition of sediments off
                                                                                                      site.




HUTCHINSON BUILDERS                                                                                                                                                          9
Log in to download the original file

24647 Seaview Tce Enviro Mgmt Plan.pdf · 18.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.