24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnList of Referenced Legislation & Codes of Practice – Environment
HB-HSEQ-F-005-A Version 5
Issue Applicable Legislation / Regulating Major Requirements of Legislation
Guidelines / Standards Authority
Location of Above Ground Electrical Safety Act 1945 WA and Regulation Economic Regulation Greater than 3m clearance required for power lines on timber
Services 1947 Authority (ERA) WA poles. Greater than 8m clearance required for other power
lines.
Inside these distances require inspection by authorised
personnel (Ph: Utilities).
Exclusion zone required for operation of plant near live electric
lines.
Noise and Vibration
Sensitive Receptors Environmental Protection Act 1986 WA DER Minimise the effects of noise on adjacent environmental
Environmental Protection (Noise) Policy 1997 WA values, including neighbours, unless authorised by an
Environmental Authority, Development Approval.
If an activity is expected to cause noise, which is expected to
be unreasonable, refer to Schedule 1 of EP (Noise) Policy.
Schedule 1 provides a list of acceptable noise limits for
different activities.
AS/NZ 2436:1981 "Guide to Noise Control on Australia Standards Methods for sound measurement and the control of noise are
Construction, Maintenance and Demolition sites". outlined
Guidelines provided for hearing protection
Noise Thresholds / Hours of Nuisance Laws prescribed in the Environmental DER Work Hours on the project are Mon-Sat 0700hrs to 1700hrs,
Operation Protection Act 1986 WA except where prior approval has been obtained (e.g. from local
Local Council Laws council).
Local regulations shall also be followed.
Soil Management
Erosion and sediment control Environmental Protection (Water) Policy 2009 DER Must not deposit sand, soil, silt or mud—
WA - in a roadside gutter, stormwater drain; or
- in a place where it could move or be washed into a roadside
Best Practice Erosion & Sediment Control 2008
gutter, stormwater drain or water
Local council can develop environmental plans to manage
erosion and sediment erosion issues. Check with the
appropriate local council for further details
Waste Management
HUTCHINSON BUILDERS 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.