Original source · versioned page text
24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn MCU14/0084
33. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site must be at no cost to
Council.
34. The transportation of all materials to and from the site must be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site must be covered to prevent materials including dust being
windblown from the vehicle.
5 REFERRAL AGENCIES
The referral agencies applicable to this application are:
Referral Referral Agency and Referral Trigger Response
Status Address
Concurrence SARA at DSDIP Mike Residential Use The agency provided
Ahern Government Greater than 1000m² its response on 30
Building 12 First in a Coastal January 2015
Avenue Management District (Reference No. SDA-
MAROOCHYDORE 1114-015945. A copy
QLD 4558 Online: of the response is
Mydas (at attached.
www.dsdip.qld.gov.au)
Email:[email protected]
6 ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form
part of the assessment manager conditions:
Building and Construction Industry (Portable Long Service Leave) Levy
1. The QLeave levy must be paid prior to the issue of a development permit where it is
required. Council will not be able to issue a Decision Notice without receipt of details that
the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
2. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will
result if all works are lodged in a single application.
Qualified Person
3. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
stability for the development, a qualified person is considered to be a person who:
(a) is a Registered Professional Engineer of Queensland (RPEQ); and
(b) has a degree in civil engineering or engineering geology; and
(c) has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in addition
to the requirements of the National Construction Code as they relate to people with disabilities,
one or more of the following may impact on the proposed building work:
a. the Disability Discrimination Act 1992 (Commonwealth);
b. the Anti-Discrimination Act 1991 (Queensland); and
Page 6 of 11
Document Set ID: 19879056
Version: 1, Version Date: 16/03/2015 Print Date: 16 March 2015, 2:32 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.