24647 Seaview Tce Enviro Mgmt Plan
Attached to the e-mail MCU14/0084 Environmental Management Plan (71 Seaview Tce).
The original of this document is very large (18.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn SDA-1114-015945
Our reference: SDA-1114-015945
Your reference: MCU14/0084
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Material change of use – Coastal management districts
Schedule 7, Table 3, Item 5 – Coastal management districts —Pursuant to section 255D of the
Sustainable Planning Act 2009, the chief executive administering the Act nominates the Director-
General of the Department of Environment and Heritage Protection to be the assessing authority
for the development to which this development approval relates for the administration and
enforcement of any matter relating to the following condition(s):
1. The development must be carried out generally in accordance At all times
with the following plans:
‘Site Plan’ prepared by TOD Consulting Engineers dated
10/10/14, drawing number 14517-OP03, Revision B
‘Earthworks – Cut Plan’ prepared by TOD Consulting
Engineers dated 10/10/14, drawing number 14517-OP10,
Revision B.
2. During the construction phase of the works: For the duration of
the works the subject
(a) install and maintain all measures, plant and equipment of this approval
necessary to ensure compliance with these conditions;
(b) only use materials which are:
i. clean and free of silt;
ii. free from pests, chemicals and other contaminants
as defined under section 11 of the Environmental
Protection Act 1994; and
iii. suitable for the purpose; and
(c) promptly remove any material or debris which has been
deposited within the coastal management district or tidal
waters, other than in accordance with this approval.
3. Erosion and sediment control measures are to be installed and Prior to
maintained to prevent the release of sediment to tidal waters. commencement of
the works and
maintained until
their completion
4. Should the works become damaged as a result of erosion, At all times
flooding or storm tide inundation, the registered landowner(s) of
the land to which the works are attached, shall be responsible for
the collection and removal of all debris, previously being a part of
the works, at their own expense.
5. Any disturbed or oxidised acid sulfate soil must be treated and For the duration of
managed in accordance with the current Queensland Acid Sulfate the works the subject
Soil Technical Manual: Soil Management Guidelines v4.0, of this approval
Department of State Development, Infrastructure and Planning Page 4
Document Set ID: 19878494
Version: 1, Version Date: 13/03/2015 Print Date: 16 March 2015, 2:32 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.