Decision Notice - Approved by Delegation of Authority DBW24 0162 (As Published) · DBW24/0162
Currency Period
2. This development approval lapses if the works have not substantially started by 6 May 2027,
unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
WD.104 DA3 Site Setout 14.04.25
Prepared by Aboda Design Group
WD.201 DA3 Lower Plan – Demolition 14.04.2025
Prepared by Aboda Design Group
WD.202 DA3 Lower Plan - Proposed 14.04.25
Prepared by Aboda Design Group
WD.203 DA3 Main Plan - Demolition 14.04.25
Prepared by Aboda Design Group
WD.204 DA3 Main Plan - Proposed 14.04.25
Prepared by Aboda Design Group
WD.205 DA3 Upper Plan – Proposed/Demoltion 14.04.25
Prepared by Aboda Design Group
WD.206 DA3 Roof Plan – Proposed & Dem’n 14.04.25
Prepared by Aboda Design Group
WD.501 DA3 North Elevations 14.04.25
Prepared by Aboda Design Group
WD.502 DA3 South Elevations 14.04.25
Prepared by Aboda Design Group
WD.503 DA3 East & West Elevations 14.04.25
Prepared by Aboda Design Group
WD.601 DA3 Section A 14.04.25
Prepared by Aboda Design Group
WD.602 DA3 Section B 14.04.25
Prepared by Aboda Design Group
WD.603 DA3 Section C 14.04.25
Prepared by Aboda Design Group
WD.604 DA3 Section D 14.04.25
Prepared by Aboda Design Group
Page 2 of 9
Document Set ID: 23721355
Version: 4, Version Date: 07/05/2025