Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

131999.982622.5 Approved Plans

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  NOTES:
                                                                                                                                                                                                                                                                                                                         -

  1. THE DESIGN SHOWN IS A PRELIMINARY CONCEPT ONLY AND IS NOT                                                                                                                                                                                   INSTALL 1 X SPEED HUMP                                      APPROVED PLANS
     TO BE USED FOR CONSTRUCTION PURPOSES.
  2. DETAILED DESIGN IS TO BE PREPARED BY A CIVIL ENGINEER AND IS
                                                                                                                                                                                                                                                                                                              131999.982622.5
     TO ADDRESS ALL STORMWATER ISSUES.                                                                                                                                                                                                                                                                        NOOSA COUNCIL
  3. ALL PAVEMENT MARKING & SIGNAGE TO BE IN ACCORDANCE WITH
     MUTCD AND AS/NZS 2890.1:2004.
                                                                                                                                                                                                                                                                                                               15 MARCH 2018
                                                                                                                                                                                                                                                                                                                         -


                               PARKING SUMMARY

            LOSS                            GAIN           NET CHANGE

                  -3                         1                       -2




                                                                                                                                                                                                                                                     INSTALL 2 X PEDESTRIAN KERB RAMPS
                                                                                                                                                       INSTALL DIVIDING LINE


                                                                                                                                                                                                                                                                INSTALL 6 x WHEEL STOPS




                                                                                                                                                                                                                                          INSTALL STOP LINE & DIVIDING LINE
                                                       INSTALL PAVEMENT MARKING AS SHOWN
                                                         TO REINSTATE ORIGINALLY APPROVED
                                                       2-WAY TRAFFIC FLOW AS PER EASEMENT
                                                               AGREEMENTS WITH NEIGHBOUR




                                                                           CUT BACK ISLAND & REMOVE 1 x PARKING SPACE
                                                                                                                                                                                                                                                                   INSTALL 2 X PWD PARKING SPACES
                                                                                   TO IMPROVE PEDESTRIAN PROVISIONS
                                                                                                                                                                                                                                                                   & ASSOCIATED BOLLARDS & SIGNS

                                                                                                                                           REMOVE 1 X BITUMEN
                                                                                                                                          FORMED SPEED HUMP




                                                                                                                                                                                                                                                                         INSTALL 1 X SPEED HUMP

                                                                                                                                INSTALL 1 X SPEED HUMP




                                                                                                                                                                                                                                                                                    CONVERT 2 x PWD SPACES
                                                                                                                                                                                                                                                                                    TO 3 x STANDARD SPACES




                                                                                                     SCALE                                                                                                                           PROJECT                                                                      PROJECT NUMBER   ORIGINAL SIZE
                                                                                                         0   10            20        30           40        50m

                                                                                                                                                                               T TM CONSULTING PTY LTD                                         NOOSA VILLAGE SHOPPING CENTRE                                      17BRT0143            A3
                                                                                                                                                                               ABN 65 010 868 621                                    DRAWING TITLE                                                                DRAWING NUMBER     REVISION
 D     29-11-17        GENERAL AMENDMENTS                                  DG       DG      DG                    SCALE 1:1000 AT ORIGINAL SIZE
                                                                                                                                                                               LEVEL 1, 129 LOGAN ROAD, WOOLLOONGABBA, QLD, 4102
 C     30-08-17        GENERAL AMENDMENTS                                  DG       DG      DG       NORTH        CLIENT                                                       P.O. BOX 1310, COORPAROO BC, QLD, 4151                          RECOMMENDED TRAFFIC MODIFICATIONS                                  17BRT0143-02         D
 B     14-07-17        GENERAL AMENDMENTS                                  DG
                                                                                                                   FORT STREET REAL ESTATE CAPITAL                             T: (07) 3327 9500 F: (07) 3327 9501                             NORTHERN AREA                                                      DATE                SHEET
 A     15-05-17        ORIGINAL ISSUE                                      DG                                                                                                  E: [email protected]   W: www.ttmgroup.com.au                                                                                29 NOV 2017      2 OF 3
REV.    DATE                                 AMENDMENT DESCRIPTION        DRAWN   CHECKED APPROVED
Log in to download the original file

131999.982622.5 Approved Plans.pdf · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.