Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3.1                    Preliminary
(1)    The strategic framework sets the policy direction for the planning scheme and forms the basis for ensuring appropriate
       development occurs in the planning scheme area for the life of the planning scheme.
(2)    Mapping for the strategic framework is included in Schedule 2.
(3)    For the purpose of describing the policy direction for the planning scheme, the strategic framework is structured in the following
       way:
       (a)    the strategic intent under the following seven themes:
              (i)      Regional context
              (ii)     A well managed and sustainable Noosa Shire
              (iii)    A connected, safe and happy community
              (iv)     Housing to meet diverse needs of the community
              (v)      Noosa's natural environment
              (vi)     A diverse and resilient economy
              (vii)    An innovative and responsive transport system
              (viii)   Coordinated and efficient infrastructure
              (ix)     Preparing for natural hazards and increasing resilience

       (b)    the strategic outcomes for development under the following key matters:
              (i)      Settlement
              (ii)     Community wellbeing
              (iii)    Housing choice
              (iv)     Biodiversity and environment
              (v)      Economy and employment
              (vi)     Transport and movement
              (vii)    Infrastructure and services

       (c)    the following strategic framework maps:
              (i)      Strategic Framework Map SFM 1 (Settlement)
              (ii)     Strategic Framework Map SFM 2 (Economy and Employment)
              (iii)    Strategic Framework Map SFM 3 (Infrastructure)
              (iv)     Strategic Framework Map SFM 4 (Biodiversity)

(4)    The strategic framework in its entirety represents the policy intent for the planning scheme.

Editor's Note—Noosa Council has consistently taken a long term planning approach to sustainable planning in Noosa Shire. The planning scheme
continues this approach and has adopted a 20­year plus planning horizon. However, the planning scheme itself (as a statutory document) is likely to
have an operational life of around 10 years.

Editor's Note—The strategic framework is taken to be the strategic outcomes for the purpose of section 16(1)(a) of the Act.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                         Page 1 of 1
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.