Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                             If a rural fire brigade                               Acceptable outcomes AO7, AO8, AO10, AO11,
                                                                                   AO12, AO13 and AO15 of the Rural Zone Code
                                                                                   Acceptable outcomes AO7, AO8, AO10, AO11,
                                                                                   AO12, AO13 and AO15 of the Community
                                                                                   Activities Code
                                                                                   Works codes
Entertainment activities
Function facility            Impact assessment
                                                                                   The planning scheme
Tourist attraction           Impact assessment
                                                                                   The planning scheme

Industry Activities
Extractive industry          Impact assessment

                                                                                   The planning scheme
Bulk Landscape supplies Impact assessment

                                                                                   The planning scheme
Transport depot              Code assessment
                             If no more than three heavy vehicles or pieces of     Rural Zone Code
                             plant machinery                                       Industry Activities Code
                                                                                   Works codes
                             Impact assessment
                             If not otherwise specified                            The planning scheme

Infrastructure Activities
Landing                      Code assessment
                                                                                   Rural Zone Code
                             Editor’s Note—An operational works application is     Waterways Works Code
                             required for operational works for prescribed tidal
                             works in other watercourses.


Renewable energy             Accepted development
facility
                             Solar cells confined to the roof surface area of a
                             dwelling house or domestic outbuilding if not
Editor’s Note—domestic
                             exceeding a total surface area of 300m²
solar systems are not
included in this use         Code assessment
definition                   If a solar farm with a total surface area of all      Rural Zone Code
                             photovoltaic solar cells not exceeding 1,000m2        Infrastructure Activities Code
                                                                                   Works codes
                             Impact assessment
                             If not otherwise specified                            The planning scheme
Substation                   Impact assessment
                                                                                   The planning scheme
Telecommunications           Impact assessment
facility
                             If located at least 100 metres from any sensitive land The planning scheme
                             use as defined.



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                     Page 4 of 9
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.