Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version
The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Carrying out building work not associated with a Waste Management Code
material change of use if for removal or demolition Water Quality and Drainage Code
of a building.
Editor’s Note—Removal means the removal of a
building or other structure whether or not for
rebuilding at another site. Bringing in and
rebuilding a house or Class 10a structure on a
previously vacant lot constitutes a material change
of use.
Note—Carrying out building work associated with a material change of use is subject to any development conditions of a
development permit for the material change of use.
Editor's Note—The above categories of development and assessment apply unless otherwise prescribed in the Regulation.
**FINAL DRAFT Post Consultation 2019**
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.