Log in to see the plans as drawn5.9 Categories of development and assessment Overlays
The following tables identify where an overlay changes the categories of development and assessment from that identified in a zone or
local plan and the relevant assessment benchmarks.
Note—Some overlays may only be included for information purposes (e.g agriculture). This may result in no change to the level of assessment or
assessment criteria under the planning scheme.
Note—Where development is proposed on land that is included in more than one overlay, the level of assessment is the highest level for each aspect of
development under the applicable overlay.
Note—Development that is not identified as being subject to an overlay in this table does not require assessment against an overlay code.
Table 5.9.1 Acid Sulfate Soils Overlay benchmarks and criteria
Development subject to Categories of development and assessment Assessment benchmarks for assessable
overlay development
Acid Sulfate Soils Overlay if within Areas 1 and 2
Code assessment
All development
If: Acid Sulfate Soils Overlay Code
(a) within Area 1 as identified on an Acid Sulfate
Soils Overlay Map and involving:
(i) excavation of 100m³ or more of material;
or
(ii) filling of land with 500m³ or more of
material; or
(b) within Area 2 as identified on an Acid Sulfate
Soils Overlay Map and involving excavation of
100m³ or more of material at or below 5
metres AHD.
Editor's note—refer to figure 5.9.1.1 for works that
may disturb acid sulfate soils and may require
assessment.
Figure 5.9.1.1 Acid Sulfate Soils
**FINAL DRAFT Post Consultation 2019**
Page 1 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.