Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                                  Acceptable Outcomes
PO11                                                                  AO11.1
The flood detention and amenity functions of the area adjoining       A minimum of 25% of the area within 4.5 metres of the revetment
the Noosa Waters revetment wall are retained and enhanced by          wall is gardens planted with shrubs and small trees with a mature
ensuring:                                                             height of 3 metres or less.
(a)   works do not protrude through a batter line of 1:4.5
      measured from the centre line of the revetment wall;            AO11.2
                                                                      The ground surface within the first metre of the revetment wall—
(b)   there is no additional load placed on the revetment wall;
                                                                      (a)    is grass or ground cover; and
(c)   works do not pose a risk to the membrane adjoining the
      revetment wall;                                                 (b)    does not include shrubs.

(d)   the watercourse and surrounding land uses are not
                                                                    AO11.3
      adversely affected by development (building works, filling or
                                                                    Side boundary fences within 4.5 metres of the revetment wall
      excavation) ensuring:
                                                                    taper down to a maximum height of 1.2 metres at the revetment
       (i)   the area is predominantly soft landscaping;            wall and no more than 1.5 metres at a distance of 2.25 metres
       (ii)  a maximum    of 25% of the area is impervious;         from the revetment wall.

       (iii)    dominant impervious areas and masonry retaining
                                                                        AO11.4
                walls are avoided;
                                                                        No shore side anchor points are within 4.5 metres of the
       (iv)     retaining structures and the like are light weight, low revetment wall.
                rise and screened by landscaping;
       (v)      natural materials such as timber or rock are used
                rather than manufactured materials;
       (vi)     the acoustic privacy and access to sunlight of
                surrounding development is protected;
       (vii)    views are not impeded; and
       (viii)   shore side anchor points are avoided.



Design             Table 6.3.1.3 Criteria for assessment (part)
Performance Outcomes                                                  Acceptable Outcomes
Design




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 6 of 14
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.