Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                                   Acceptable Outcomes
                                                                       and landscaping of the site.


Environment, heritage and scenic amenity                           Table 6.3.2.3 ­ Criteria for assessment (part)
Performance Outcomes                                                   Acceptable Outcomes
Environment, heritage and scenic amenity
PO21                                                                   AO21.1
Development:                                                           For landscape amenity reasons, cut or fill is less than 1.5 metres
(a)   has minimal impact on the natural landform of the site;          in depth relative to the ground level.

(b)   does not lead to erosion or the transport of sediments off
                                                                       AO21.2
      site; and
                                                                       Development does not result in sediment or other material
(c)   does not lead to the disturbance of natural features,            including building materials or waste products being deposited or
      buildings or structures of cultural heritage significance.       released into the road reserve, stormwater drain or adjacent
                                                                       properties.

                                                                       AO21.3
                                                                       Development on a site adjoining a local heritage place respects
                                                                       the cultural heritage significance of the place by mitigating any
                                                                       adverse impacts on the setting or integrity of the heritage values.

                                                                       Editor’s Note— Local heritage places are identified on the
                                                                       Heritage and Character Areas Overlay maps in Schedule 2.
PO22                                                                   AO22.1
Development on sloping sites:                                          Buildings and structures are not constructed on land with a slope
(a)   is visually responsive to the natural topography and sits        greater than 25%.
      within the landscape rather than dominating it; and
                                                                       AO22.2
(b)   steps down slopes or uses suspended floor construction,
                                                                       On sloping sites, split­level buildings, with small floorplates, that
      minimising cut or fill and avoiding benching of the site.
                                                                       step down the slope are used as an alternative to standard single
                                                                       or double storey construction to minimise building bulk and
                                                                       benching of the sites.

                                                                       Editor's note­ refer to Figure 6.9.1A and Figure 6.9.1B

                                                                       AO22.3
                                                                       The distance between the ground level and the lowest part of the
                                                                       floor of the building does not exceed 3 metres.


Earthworks and drainage                 Table 6.3.1.3 Criteria for assessment (part)
Performance Outcomes                                                   Acceptable Outcomes
Earthworks and drainage
PO23                                                                   AO23
Filling and excavation for operational works do not directly,          Filling and excavation for operational works i s designed and
indirectly or cumulatively cause adverse impacts external to the       constructed to ensure overland flow and/or flooding is not
development site by:                                                   worsened, impeded, or otherwise diverted to adversely affect other
(a)   causing ponding of water on the site or nearby land;             properties or downstream environments.

(b)   increasing flooding, which adversely affects the safety or
      use of any land upstream or downstream; or
(c)   adversely affecting the flow of water in any overland flow
      path.

Figure 6.3.2.4 ­ Streetscape Character & Building Bulk ­ Medium Density Street


  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 12 of 13
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.