Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                                  Acceptable Outcomes
PO20
For development on Lot 3 RP884396, Noosa Heads:                       No acceptable outcome provided.
(a)   1 in every 10 dwellings shall be social housing, provided at
      no cost to council or the provider, to provide for the social
      housing needs of the community; and
(b)   The social housing dwellings shall be distributed evenly
      across the development and provided for the life of the
      development

Editor’s Note ­ Social housing is housing made up of public and
community housing, that is owned and run by the government or a
non for profit agency ( as the provider) for people on low incomes
or with special needs.




Earthworks and drainage                 Table 6.3.3.3 Criteria for assessment (part)
Performance Outcomes                                                  Acceptable Outcomes
Earthworks and drainage
PO21                                                                  AO21
Filling and excavation for operational works do not directly,         Filling and excavation for operational works i s designed and
indirectly or cumulatively cause adverse impacts external to the      constructed to ensure overland flow and/or flooding is not
development site by:                                                  worsened, impeded, or otherwise diverted to adversely affect other
(a)   causing ponding of water on the site or nearby land;            properties or downstream environments.

(b)   increasing flooding, which adversely affects the safety or
      use of any land upstream or downstream; or
(c)   adversely affecting the flow of water in any overland flow
      path.

Figure 6.3.3.4 ­ Streetscape Character & Building Bulk ­ High Density




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                            Page 11 of 12
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.