Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
(r)       Connecting habitat areas, identified on Strategic Framework Map SFM­4 ­ Biodiversity, are maintained and enhanced through
          replanting, habitat restoration, strategic offset plantings, avoiding clearing and fragmentation, and ensuring unimpeded fauna
          movement.
(s)       Coastal foreshores, including near​shore marine environments, beaches, dunes rocky headlands, coastal lagoons, beach shores,
          river mouths and estuaries are improved and maintained predominately in their natural state.
(t)       Development avoids adverse impacts on natural coastal processes, resources and values, and maintains the ability of coastal
          areas to naturally fluctuate without the need for management or protection.
(u)       Landscape design and replacement plantings on public and private land utilise native vegetation to provide habitat for flora and
          fauna.
(v)       Sustainable land management practices and effective erosion and sediment controls are utilised to protect water quality and
          catchment health. Land condition and soil health is maintained and improved.
(w)       The built environment is designed to be low carbon, resilient, well connected and have minimal environmental impact. There are
          an increasing number of developments meeting nationally recognised sustainability ratings.
(x)       The Noosa community is carbon neutral as a result of adopting low emissions production and land use practices, increased
          carbon capture in the soils and vegetation of Noosa Shire, and best practice resource recovery and reuse.
(y)       Development is located, designed, constructed and operated to avoid or minimise air, odour and noise emissions and any
          potential impacts on the natural environment and sensitive receiving environments.


3.3.5                 Economy and Employment

The strategic outcomes for economy and employment by 2041 are:
(a)       Noosa’s economy is diverse and resilient and development supports both established and emerging priority industry sectors by
          providing business growth pathways.
(b)       Development supports positive business outcomes that are aligned with Noosa's point of difference and the 'Noosa Brand' and is
          focused around high levels of amenity, natural character and environmental sustainability.
(c)       Development is encouraged that caters for industries with high economic yield and low environmental impacts, and where
          sustainable practices are the norm.
(d)       Smart, innovative and sustainable businesses and industries are promoted and provided for, which are responsive to new
          technologies and changing market conditions.
(e)       Noosa's diversified economy is underpinned by a complementary mix of business activities that support new technologies, new
          enterprises, new ways of doing business and flexible work arrangements. Opportunities for affordable workspaces, convenient
          work from home enterprises, shop­top housing and co­​working spaces are encouraged. This includes providing a variety of
          business spaces that allow for natural growth from home­​based businesses to small premises and then to larger premises.
(f)       Co​­location and industry clusters with flexible shared floor space and enterprise precincts are encouraged as they provide an
          opportunity to create hubs of creativity and support new business needs of the future.
(g)       Employment areas, education/ training and mixed­use developments are provided to meet the needs of the current and next
          generation.
(h)       Activity centres are vibrant hubs of activity with appropriate mixed uses creating diverse enterprise and housing opportunities, as
          well as access to good transport, community services and well­connected fast communication and digital services.
(i)       Buildings and spaces further enhance the individual sense of identity, character, role and function of centres.
(j)       Centres provide well designed spaces for community interaction and vitality and include high levels of streetscape appeal, outdoor
          meeting areas, and effective interface between public spaces and private development, consistent with the Noosa Design
          Principles.
(k)       Development provides non­discriminatory accessibility to open space, community uses and business developments.
(l)       Coal exploration, coal mining, coal seam gas exploration or coal seam gas production within the Shire are not supported due to
          associated environmental and social impacts and incompatibility of such activities with Noosa's natural assets and lifestyle.


Activity Centres Hierarchy
(m)       A supportive hierarchy of activity centres (shown in Strategic Framework Map SFM­2 ­ Economy and Employment is maintained to
          ensure each centre has a defined role and positively contributes to the local and regional network of centres.
(n)       The hierarchy of centres avoids duplication of business and community facilities and supports an orderly and economically


      **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                   Page 4 of 9
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.