Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (15.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
Performance outcomes                                                 Acceptable Outcomes
Earthworks and Drainage
PO37                                                                     AO37
Filling, excavation and retaining structures do not directly, indirectly Filling and excavation works are designed and constructed to
or cumulatively cause adverse impacts external to the                    ensure overland flow and/or flooding is not worsened, impeded,
development site by:                                                     or otherwise diverted to adversely affect other properties or
(a)     causing ponding of water on the site or nearby land;             downstream environments.

(b)    increasing flooding, which adversely affects the safety or
       use of any land upstream and downstream; or adversely
       affecting the flow of water in any overland flow path.


Environment and Heritage                     Table 6.5.1.3 Criteria for assessment (part)
Benchmarks for assessable development including benchmarks for all Industry Precincts (part)
Performance outcomes                                                 Acceptable Outcomes
All activities
Environment and Heritage
PO38                                                                 AO38.1
Development:                                                         Development does not result in sediment or other material
(a)    has minimal impact on the natural landform of the site;       including building materials or waste products being deposited or
                                                                     released into the road reserve, stormwater drain or adjacent
(b)    does not lead to erosion or the transport of sediments off
                                                                     properties.
       site; and
(c)    does not lead to the disturbance of natural features,         AO38.2
       buildings or structures of cultural heritage significance.    Development on a site adjoining a local heritage place respects
                                                                     the cultural heritage significance of the place by mitigating any
                                                                     adverse impacts on the setting or integrity of the heritage values.

                                                                     Editor’s Note— Local heritage places are identified on the
                                                                     Heritage and Character Areas Overlay maps in schedule 2.
PO39
Industry and business activities are conducted in an        No acceptable outcome provided
environmentally responsible manner, operating without
deleterious impacts on immediate, surrounding or downstream
communities, environments or environmental processes.
PO40
The storage and use of materials on­site does not cause a public No acceptable outcome provided
health hazard or environmental nuisance.




Infrastructure         Table 6.5.1.3 Criteria for assessment (part)
Performance outcomes                                                 Acceptable Outcomes
All activities
Infrastructure
PO41                                                                 AO41
Development is supported by adequate infrastructure and urban        Development is connected to reticulated water supply, sewerage
services including reticulated water, sewerage, stormwater           and electricity infrastructure networks.
drainage, sealed roads, pathways, electricity and
telecommunication infrastructure.




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 11 of 12
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.