Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version
Plans and drawings: the text below has words only, no drawings.
Very large file (15.6 MB): may take a few minutes to open.
Performance outcomes Acceptable Outcomes
Food and drink outlet
PO4 AO4
Any food and drink outlet excluding where a complementary use, For a food and drink outlet, excluding where a complementary
is— use, the majority of the food or drink prepared and sold
(a) directly related and ancillary to a bonafide industry use on incorporates the product or output of the industry activity on the
site; and site.
(b) small scale and subordinate to the industry use onsite.
Caretaker’s accommodation No acceptable outcome provided
PO5
Development for caretaker’s accommodation:
(a) is directly associated with and subordinate to the industry
activity on site;
(b) demonstrates a demand for 24 hour care of buildings,
operations, plant or equipment;
(c) is not separately let for other accommodation activities;
(d) includes no more than one caretaker’s accommodation per
site;
(e) is on a site with an area of at least 2,000m2;
(f) has a maximum gross floor area of 65m2and
(g) is occupied by at least one person who is employed by the
primary nonresidential use onsite.
Venture Drive Enterprise Precinct
PO6 AO6
Theatres are for the production of film or music only and do not The filmmaking studio or a music recording studio is not within 50
create adverse off site impacts regarding noise, light, vibration, metres of a sensitive land use.
odour or dust on adjoining residential development.
PO7 AO7
Traderelated offices are small scale, do not compromise or Office uses are traderelated, do not exceed 15% of the gross floor
compete with the Noosa Shire Centres Hierarchy, are developed area of the development and support the industry activity on site.
in conjunction with an industry activity on site and are traderelated
only.
Built form Table 6.5.2.3 Criteria for assessment. (part)
Performance outcomes Acceptable Outcomes
All activities
Built form
**FINAL DRAFT Post Consultation 2019**
Page 3 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.