Performance outcomes Acceptable Outcomes
Lighting
PO25 AO25.1
Lighting of appropriate intensities maximises safety. Lighting of appropriate intensities is provided which satisfies the
requirements of Australian Standard AS1158: Public Lighting
Code unless otherwise specified in this Code.
AO25.2
External lighting of a graduated intensity is provided which starts
at a lower level of brightness at the perimeter of the site and rises
to a higher level at the entrance to buildings or at the centre of the
site.
AO25.3
Lighting is directed onto the site and away from neighbouring
properties.
AO25.4
Vandalresistant lighting is used in public and publicly accessible
areas.
Staff amenity
PO26 AO26
The use includes onsite amenities for employees in an attractive An onsite recreation area is provided in a private location,
setting protected from the weather. removed from any noisy or odorous activities, and incorporates—
(a) protection from the weather;
(b) safe access for all staff eating; and
(c) tables and rubbish bins
Security fencing
PO27 AO27
All property boundaries are clearly identifiable and suitable day Security fencing no less than 1.8 metres in height encloses the
and night safety and security measures are provided to protect rear and side boundaries of the site and prevents unauthorised
people and property. access to all outdoor parts of the site involved in the use.
PO28 AO28
Security fencing is in keeping with the surrounding area and does Fencing on any frontage is setback an average of 2 metres
not have an adverse impact upon the appearance of the provided that no part of the fencing is within 1 metres of the
streetscape. property boundary.
Earthworks and Drainage Table 6.5.2.3 Criteria for assessment. (part)
Performance outcomes Acceptable Outcomes
All activities
Earthworks and drainage
PO29 AO29
Filling, excavation and retaining structures do not directly, indirectly Filling and excavation works are designed and constructed to
or cumulatively cause adverse impacts external to the ensure overland flow and/or flooding is not worsened, impeded,
development site by: or otherwise diverted to adversely affect other properties or
(a) causing ponding of water on the site or nearby land; downstream environments.
(b) increasing flooding, which adversely affects the safety or
use of any land upstream and downstream; or adversely
affecting the flow of water in any overland flow path.
Environment and heritage Table 6.5.2.3 Criteria for assessment. (part)
**FINAL DRAFT Post Consultation 2019**
Page 9 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.