Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Very large file (15.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
Performance outcomes                                                Acceptable Outcomes
PO25
Development for the purpose of a community use or sport and         No acceptable outcome provided
recreation is located, designed and operated to be responsive to
the sub­tropical climate and make the most of natural light,
ventilation and on site rainwater capture and reuse.




Safety and Amenity             Table 6.6.1.3 ­ Criteria for assessment (part)
Performance outcomes                                                Acceptable outcomes

Safety and amenity
PO26
Development creates a safe environment by incorporating key         No acceptable outcome provided
elements of crime prevention through environmental design in its
layout considering:                                                 Editor’s note—development should reflect the principles of Crime
(a)   casual surveillance and sight lines;                          Prevention through Environmental Design Guidelines for
                                                                    Queensland.
(b)   exterior building design that promotes safety;
(c)   lighting;
(d)   signage and wayfinding;
(e)   minimising entrapment locations; and
(f)   building entrances, loading and storage areas that are well
      lit and lockable after hours.

PO27
Walkways, carparks and publicly accessible facilities, including    No acceptable outcome provided
toilets, and bicycle racks are
located and designed to allow casual surveillance by other
persons
PO28
Pathways allow clear sightlines in all directions.                  No acceptable outcome provided




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                          Page 7 of 11
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.