Performance outcomes                                                 Acceptable Outcomes
Vehicle loading and waste
PO34                                                                 AO34
Vehicle loading / unloading and waste storage and collection         Vehicle loading/unloading, waste storage/collection and external
areas do not significantly impact on the visual or acoustic          storage areas are enclosed within a service yard or courtyard and
amenity of open space.                                               located to the rear or under the building and not located along any
                                                                     frontage to a public street or open space.


Pedestrian and cycling connectivity                   Table 6.6.1.3 ­ Criteria for assessment (part)
Performance outcomes                                                 Acceptable Outcomes
Pedestrian and cycling connectivity
PO35                                                                 AO35
Areas used for recreation and open space complement, and             Areas used for recreation and open space are physically
where practicable, are connected to other open space or              connected by a sealed pathway to other land in the Recreation
community uses.                                                      and open space zone, Community facilities zone and the
                                                                     Environmental management and conservation zone within a
                                                                     radius of 500 metres of the site.
PO36                                                                 AO36
Development promotes safe and efficient walking and cycling by       Pedestrian and bicycle pathways are provided and retained or a
providing sealed pathways along easily understood direct routes      contribution towards pedestrian and bicycle pathways are made in
with opportunity for casual surveillance.                            accordance with the Council's infrastructure network planning

                                                                     Editor’s Note— specific pathway design requirements are
                                                                     included in PSP6 Engineering design standards


Earthworks and drainage                 Table 6.6.1.3 ­ Criteria for assessment (part)
Performance outcomes                                                 Acceptable Outcomes
Earthworks and drainage

PO37                                                                 AO37
Filling, excavation and retaining structures do not directly, indirectly Filling and excavation works are designed and constructed to
or cumulatively cause adverse impacts external to the                    ensure overland flow and/or flooding is not worsened, impeded,
development site by:                                                     or otherwise diverted to adversely affect other properties or
(a)     causing ponding of water on the site or nearby land;             downstream environments.

(b)    increasing flooding, which adversely affects the safety or
       use of any land upstream and downstream; or adversely
       affecting the flow of water in any overland flow path.


Environment and heritage                 Table 6.6.1.3 ­ Criteria for assessment (part)
Performance outcomes                                                 Acceptable Outcomes
Environment and heritage




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 9 of 11
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.