Original source · versioned page text
2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version
Plans and drawings: the text below has words only, no drawings.
Very large file (15.6 MB): may take a few minutes to open.
Performance outcomes Acceptable outcomes
PO29
Development does not adversely impact on the continued No acceptable outcome provided
operation, viability and maintenance of existing infrastructure or
compromise the future provision of planned infrastructure.
**FINAL DRAFT Post Consultation 2019**
Page 8 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.