Skip to the record
Accept no substitutions.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                In accordance with The Noosa Plan:
                           Sustainable Building Design Code – addressing water efficiency and stormwater management incorporating
                           water harvesting and reuse and reducing impervious area;
Design                     Waste Management Code and supporting planning scheme policy ­ addressing the design and location of bin
                           storage areas, recycling, waste separation and bin wash down areas;
                           Landscaping Code ­ addressing effective landscape treatment and water management to optimise
                           stormwater filtration and minimise sedimentation and erosion activity and runoff;
                           Water Quality and Drainage Code – addressing the management of wastewater, stormwater, run­off,
                           groundwater and environmental flows as part of an integrated water cycle system, including the use of WSUD,
                           managing stormwater quality, erosion and sediment. Supported by the Engineering Design Standard PSP.
                           Biodiversity Overlay – addressing the management, conservation and rehabilitation of biodiversity values
                           including riparian vegetation, aquatic fauna, soils, landforms, waterways and drainage lines.

4.4.2 Transport network
The trunk transport infrastructure network is generally considered to:
      align within (or adjacent to ) trunk road corridors; and
      provide main through linkage connections and/or to specific high use destinations and facilities.

Table 4.4.2 Transport Desired Level of Service
Road Hierarchy and Desired Level of Service (DSS)
                                       Arterial                               Distributor                                         Collector
                                 Median or Rural                                                Street                                        Sealed
Traffic (VPD)                     >20K           <20K       10K to 20K             5K to         5K to     5K to      1K to     1K to          1K to         <500
                                                                                   15K           15K       15K         5K        5K             5K
Posted Speed (km/h)                    80/100                60 or 70               60      40 or 50        80         60        60             80       Warning
Lane width (m)                    4x3.5          2x3.5           2x3.5             2x3.5         2 or      2x3.0     2x3.0     2x3.5          2x3.0          5.5
                                                                                                4x3.3^
Bike Lanes (Y/N) (m)                     Y 2.0                   Y 2.0             Y 1.5        Share        N         N         N              N             N
                                                                                                or Y*
On Street Parking (Y/N)                    No                     Y ­ sometimes offset                      No          Y         Y             N             N
Shoulder width (m)                   Dual Bike                   Dual use Park and Bike                     1.5       Dual use Park             1    N
                                                                                                                        and Bike              sealed
Carriageway width (m)             Varies         11 min     11 min k2k            10 min        Varies    9 Form     11 min    13k2k          8 min      5.5 form
                                   k2k                                             k2k                                k2k                     form
Pathway (m)                           3 in urban            3des, 2 min             2            full        N        2 desired, 1.2                     N
                                                                                  desired       width                    min %
Pathway sides                             One                    Both              One          Where        N        Both      Both                   N/A
                                                                                                 Dev
Median landscaped (m)             Y3 min          N/A     Sometimes for aesthetics              2 min.^      N          Varies for                     N/A
                                                                                                                        aesthetics
Reservation width (m)               Reserve width = lanes + median + paths + verges                       20 Min                      20 Min
Lighting Standard                   V4            V3        V3           V3              V3, P4           Int'sect     V3      Int'sect       Int'sect       N/A
                                                                                                             V4                   V3             V3
Traffic Loading (EsA's)                5 x 106                            1 x 106                         1 x 106    5 x 105   1 x 106        1 x 106        N/A
Limited Access (Y/N)                         Y                                N                           At times     N         N              N             N
Noise Attenuation                  Subject to noise levels                                  N                                             N
^ Lane configuration and median type depend on the streetscape
% Pathway widths are demand driven
* Provision of separate bike lanes depends on traffic situation and commercial acceptance




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                                     Page 6 of 11
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.