Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version

of 400

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Land Quality and Size
Public Park Hierarchy type          Size        Flood Immunity      Acceptable      Slope       Minimum      Minimum      Unsuitable Land
                                   Target                              % of                      Width         Road
                                                                     useable                                 Frontage
                                                                       land
Shire Wide Recreation Park        2­30+ha      Well drained         75%           75%         Variable    Variable          Steep slopes;
                                               above 1:5            useable       between     depending depending           Land used as
District Recreation Park           1­10 ha
                                               average.             land,         flat and    on the      on the            separation or
                                               Recurrence           however,      1:10        setting and setting and       buffer areas to
                                               interval level (Q5   may vary      maximum function of function of           any transport
                                               flood level) with at depending     slope,      the         the               corridor,
                                               least 10% above on the             however,    recreation recreation         industrial or
                                               the 1:100 ARI level setting and    may vary    park        park              commercial
                                               or the highest       function of   depending                                 use;
                                               known flood level the              on the                                    Power
                                               whichever is the     recreation    setting and                               easements
                                               greater.             park.         function of                               (consideration
                                                                                  the                                       may be given
                                                                                  recreation                                the use of the
                                                                                  park.                                     land as a
                                                                                                                            linear link for
All Sports Parks                   2­15 ha         Building and     80%           Principally Minimum       Close to
                                                                                                                            walking,
                                                   fenced areas     useable       a flat site width 150     an arterial
                                                                                                                            cycling, or
                                  A number         above Q100       area for      with 5 %    metres        road
                                                                                                                            other transport
                                   of sports       Playing fields   sports and    gradient or               network
                                                                                                                            network;
                                  parks can        above Q 20       active        less
                                                                                                                            Land
                                  co­locate        Wetland          recreation.
                                                                                                                            encumbered
                                                   treatment
                                                                                                                            by other
                                                   areas above
                                                                                                                            infrastructure
                                                   Q10
                                                                                                                            distribution
                                                   Playing
                                                                                                                            network that
                                                   surfaces are
                                                                                                                            may limit park
                                                   well drained
                                                                                                                            development
Land for Community facilities    Variable  Building and                80%        Principally   Variable    Variable        opportunities
                                 depending fenced areas               useable     a flat site   depending   depending       or presents a
                                 on the    above Q100                  area       with 5 %      on the      on the          hazard to
                                 land’s                                           gradient or   land’s      land’s          users;
                                 intended                                         less          intended    intended        Land affected
                                 purpose                                                        purpose     purpose         by chemical
                                                                                                                            contaminants,
                                                                                                                            soil stability
                                                                                                                            problems or
                                                                                                                            hazardous
                                                                                                                            substances
                                                                                                                            presenting a
                                                                                                                            hazard to
                                                                                                                            users;
                                                                                                                            Land
                                                                                                                            containing
                                                                                                                            other hazards
                                                                                                                            that pose a
                                                                                                                            risk to users.



Setting and embellishment




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                               Page 9 of 11
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 5 - Final New Noosa Plan - Part 1-6 - Clean version(PDF, 15MB).pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.