Original source · versioned page text
Appendix B - Global Stability Assessment Report
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Elevation (m)
147
145
143
141
139
137
135
133
131
129
127
Figure 1b - Retaining Wall Supporting Cut Batter (Batter Behind Retaining Wall)
Color Name Unit —_ Effective Effective
Weight Cohesion Friction
(kNim?) (kPa) Angle (°)
[] Controlled Fill 19 1 25 eo
Oo Natural Stiff Clay 19 5 30
(CH) (XW Granite)
[1] Retaining wall 21
Groundwater
10kPa
PSCC Hp CII
x
LSC
Distance (m)
SLOPE/W Analysis
Fig 1b.gsz
22/11/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.