Original source · versioned page text
Appendix B - Global Stability Assessment Report
Attached to the e-mail Operational Works Application - DA Form 1 - Town Planning Report - Global Stability Assessment Report - Earthworks Compaction Report - Erosion and Sediment Control Plan - 36 Tunba Court Cooroy Mountain.
The original of this document is very large (10.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Elevation (m) 135) 134 133 132 131 130 129 128 127 126 125 124 123 122 121 120 Color Name Weight Cohesion Friction. Figure 2c - 4.5m High Fill Batter Supported by Retaining Wall (kN/m*) (kPa) Angle (°) LE] Controlled Fill 19 1 25 B eyavemy 8 * CO Retaining Wall 21 1.55 e 10kPa 3m high retaining wall ft. _ Groundwater 1 week mek } Seek | ae mee | 0 10 20 30 40 Distance (m) SLOPE/W Analysis Fig 2c.gsz 19/11/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.