               DEVELOPMENT ASSESSMENT DELEGATED REPORT

               Author                  Development Engineer, Murray Nagle
                                       Development Assessment



                    APPLICATION DETAILS

                    Application No.                OPW26/0092

                    Applicant                      Project BA

                    Proposal                       Operational Works – Vehicle Crossover

                    Properly Made Date             9 July 2026

                    Information Request Date       Not Applicable

                    Information Response Date      Not Applicable

                    Decision Due Date              7 September 2026

                    Report Reviewed &              Daniel Epps – 19 August 2026
                    Finalised By


                    PROPERTY DETAILS

                    Property Address               69 Kauri St Cooroy Qld 4563

                    RP Description                 Lot 401 C 56014

                    Land Area                      1010.0000 m²

                    Existing Use of Land           Residential


                    STATUTORY DETAILS

                    SEQRP Designation              Urban Footprint

                    Zone                           Low Density Residential

                    Precinct                       Not applicable

                    Local Plan Area                Cooroy

                    Overlays                       Bushfire Hazard

                    Assessment Type                Code

               1.      PROPOSAL
               The application seeks approval for Operational Works – Vehicle Crossover.
               The locality and proposal plan are included below.




Document Set ID: 25063228
Version: 2, Version Date: 18/08/2026

Log in to download the original (Delegated Report - Code - Planning OPW26 0092 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 7 pages

Page 2

                                                   Figure 1 – Locality




                                       Figure 2 – Site Plan (Prepared by Applicant)



                                                                                      Page 2 of 8

Document Set ID: 25063228
Version: 2, Version Date: 18/08/2026

Page 3

               2.     SITE DETAILS
               2.1. Site Description
               Residential.
               2.2. Surrounding Land Uses
               Low Density Residential.
               3.     ASSESSMENT
               3.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •      State Planning Policy;
               •      South East Queensland Regional Plan;
               •      Planning Regulation 2017; and
               •      Noosa Plan 2020 (20 March 2026).
               3.2. Noosa Plan 2020
               The following codes from the Noosa Plan 2020 are applicable to this development:
               •      Low Density Housing Zone Code;
               The application has been found to generally comply with all applicable statutory instruments. The
               pertinent issues arising out of the assessment are discussed below:
               The site possesses three (x3) road frontages and currently has vehicle access from Ruby Street.
               The proposal is for the existing vehicle crossover to be decommissioned and a new vehicle
               crossover instated on the frontage of Kauri Lane, a lower hierarchy road.
               The new vehicle crossover is intended to access a shed with space for two (x2) vehicles. The
               proposed vehicle crossover location has minimal road reserve width present between the Kauri
               Lane road edge and the property boundary, clear of services.
               The plan submitted as part of the application material isn’t sufficient in detailing the extent of work.
               In considering the application and the non-standard nature of the proposed crossover governed by
               site constraints including a narrow laneway, engineering considers that the proposed vehicle
               crossover is consistent with existing crossovers in Kauri Lane, satisfies the relevant provisions of
               the Noosa Plan 2020 and recommends the following conditions.
               4.     CONSULTATION
               4.1. Referral Agencies
               Not Applicable
               4.2. Internal Council Referrals
               Not applicable
               5.     CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION
               With regard to Application No OPW26/0092 for Operational Works - situated at 69 Kauri St Cooroy
               Qld 4563 and described as Lot 401 C 56014, it is recommended the application be approved in
               accordance with the following details for the Decision Notice:


                                                                                                          Page 3 of 8

Document Set ID: 25063228
Version: 2, Version Date: 18/08/2026

Page 4

               1.      APPLICATION DETAILS

                   Application No:              OPW26/0092

                   Street address:              69 Kauri St Cooroy Qld 4563

                   Real property description:   Lot 401 C 56014

                   Planning Scheme:             Noosa Plan 2020 (20 March 2026)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Operational Works – Vehicle Crossover
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. The approved plans are listed in the following table unless
                       otherwise amended by these conditions.

                          Plan No.         Rev.       Plan/Document Name                          Date

                          01               Prelim 2 Pride Home Designs - Site Plan                21/07/2026
                                                      No 69 Kauri St Cooroy

               CURRENCY PERIOD
               2.      The Currency Period for this development approval lapses if the development has not
                       substantially started by 19 August 2028, unless an application to extend the currency period
                       is approved by Council.
               SITE SPECIFIC CONDITIONS
               3.      The vehicle crossover must be constructed to provide 1m minimum clearance to the property
                       boundary.
               4.      The vehicle crossover must neatly tie into the existing road verge in a manner that does not
                       create an ongoing maintenance burden to Council or present as a trip hazard to pedestrians.
               5.      The existing vehicle crossover located on the Ruby Street frontage is to be decommissioned
                       and the kerb and adjoining areas of verge reinstated.
               GENERAL CONDITIONS
                       Engineering
               6.      A condition report including photographs of the frontage of the site must be completed and
                       submitted to Council at the prestart meeting.
               7.      The principal contractor must have all the appropriate insurance and public liability
                       documentation to carry out the works. The principal contractor is also responsible to ensure
                       that any subcontractors also have the appropriate insurance and public liability
                       documentation. Certificates demonstrating currency of public liability insurance and works
                       insurance covering the works must be submitted to Council prior to the prestart meeting.


                                                                                                      Page 4 of 8

Document Set ID: 25063228
Version: 2, Version Date: 18/08/2026

Page 5

               8.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
               9.     A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      Traffic Management during the construction phase.
                      b.      Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
                              Devices (MUTCD)
                      c.      Provision for safe vehicle and pedestrian access across the frontage of the site both
                              during daily construction and after daily construction has ceased.
               10.    Any changes to the details associated with the Principal Contractor during construction, must
                      be notified to council in writing within five business days of the change occurring.
               11.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               12.    The integrity and condition of any existing public or Council infrastructure and services
                      (above ground and/or underground) must not be adversely affected by the proposed works
               13.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               14.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      the approved plans/documents and conditions detailed in this Decision Notice
                      b.      all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines
                      c.      the latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                     Works within Road Reserves
               15.    No removal of street trees is permitted without Council’s prior written approval.
               16.    Safe pedestrian access on all streets in the vicinity of the development must be maintained
                      at all times. Should footpath/road closures be necessary to carry out construction works,
                      Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               17.    All works must match neatly with existing road and verge/footpath features. Additional works
                      beyond the frontage may be required to provide an acceptable transition to existing road and
                      verge/footpath profiles.
                     Driveways
               18.    Driveway crossovers must be constructed generally in accordance Council’s Standard
                      Drawings RS-049, RS-050 and any associated addendum.




                                                                                                          Page 5 of 8

Document Set ID: 25063228
Version: 2, Version Date: 18/08/2026

Page 6

               19.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf, and must be maintained by the developer until established.
               20.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      the driveway surfacing must consist of either an approved hot mixed asphaltic concrete
                              or patterned/plain concrete.
                      b.      the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car
                              Parking for longitudinal and crossfall gradients.
                      c.      the driveway must be constructed so as to not concentrate or direct stormwater runoff
                              onto neighbouring properties
                      d.      underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway
                      e.      where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path
                      f.      have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset,
                              unless a written approval is obtained from Unitywater/Energex/Telstra and submitted
                              to Council.
                      g.      any stormwater kerb outlet in close proximity to the edge of the new driveway must be
                              provided with an approved kerb adaptor
                      h.      any existing kerb sections requiring removal due to the works must be saw-cut and
                              removed to allow for a smooth and neat finish with the new driveway
               21.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer.
                      Stormwater Drainage
               22.    The constructed driveway must not cause additional ponding on the road formation or the
                      road reserve.
               23.    Any proposed surface drainage grate must be located wholly within private property.
                      Environment (Erosion and Sediment Control)
               24.    Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must
                      not be released from the site or to waters within the site, or be likely to be released should
                      rainfall occur, unless all reasonable and practicable measures are taken to prevent or
                      minimise the release and concentration of contamination.
               25.    The contractor must ensure non-essential exposure of soil is prevented by restricting the
                      extent of works and minimising the duration of soil exposure to adverse weather conditions.
                      Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and
                      prior to any predicted rainfall occurring.
               26.    Erosion and sediment control measures must be installed and maintained to minimise
                      erosion on the site and to minimise the export of sediment and associated pollutants from
                      the site. The erosion and sediment control measures must be designed, installed and
                      maintained in accordance with current best practice standards (refer to advisory notes).




                                                                                                        Page 6 of 8

Document Set ID: 25063228
Version: 2, Version Date: 18/08/2026

Page 7

               FOLLOWING CONSTRUCTION
               27.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
               5.     REFERENCE DOCUMENTS

               Not applicable.
               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     As this driveway is a private structure, the owner bears full responsibly for the standard of its
                      construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed in accordance with standard drawing RS-049, RS-
                      050 and any associated addendum.
               2.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               3.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Prestart Inspections Request
               4.     Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days’ notice of preferred inspection time.
                      It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business
                      days must have passed or the applicant must have provided Council with written confirmation
                      that the applicant has accepted the conditions of Decision Notice and waived their appeal
                      rights.
               5.     If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
                      Environmental Advisory Notes
               6.     The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               7.     Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control.
                      Road Reserve Permit


                                                                                                          Page 7 of 8

Document Set ID: 25063228
Version: 2, Version Date: 18/08/2026

Page 8

               8.     This development permit provides the applicant with written authority to undertake the
                      prescribed works. Any additional activities that are undertaken inside Council’s road reserve
                      for the purpose of acting on this development permit may require a Road Reserve Permit.
                      These additional activities may include, but are not limited to, hoarding, pedestrian
                      diversions, laneway closures, etc. To apply for a Road Reserve Permit, or for more
                      information, Contact Council’s Road Reserve Officer at [email protected] Act 2014 – Fire Ant Control
               9.     Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls.
                      Performance Bond Agreement
               10.    An applicant for a development application may make an agreement with an assessment
                      manager, referral agency or other person to establish the responsibilities, or secure the
                      performance, of a party to the agreement about a development condition.
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.
               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                        Page 8 of 8

Document Set ID: 25063228
Version: 2, Version Date: 18/08/2026

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.