4. Water Quality Management
4.1 Operational Phase
The development is not required to meet the Queensland Governments State Planning Policy (July 2017) as
the site does not exceed the 2,500m 2 minimum site area. However stormwater quality management must still
be undertaken via the application of best management practices (BMPs) to ensure no adverse impacts to the
downstream environment.
Pollutants typically generated during the operational phase of the development include:
litter/gross pollutants
sediment (Total Suspended Solids – TSS)
nutrients (Total Nitrogen and Total Phosphorus – TN & TP)
hydrocarbons (oils and grease)
heavy metals
Stormwater quality best management practices may be implemented for the development as follows:
First flush diversion system for roof water diverting the roof water for irrigation purposes
Gross pollutant filter baskets in field inlet pits collection runoff from ground areas.
As the site is classified as a ‘low risk’ development the listed best management practices have been deemed
sufficient for the site area and use. Refer to Appendix B for the stormwater management drawing.
4.2 Construction Phase
Pollutants typically generated during construction phase are described in Table 4 below.
Table 4 - Pollutants typically generated during the construction phase
Pollutant Sources
Litter (Gross Pollutants) Paper, construction packaging, food packaging, cement bags.
Sediment Unprotected exposed soils and stockpiles during earthworks and
building.
Hydrocarbons Fuel and oil spills, leaks from construction equipment.
Toxic materials Cement slurry, asphalt prime, solvents, cleaning agents, wash waters.
pH altering substances Acid sulphate soils, cement slurry and wash waters.
5. Erosion and Sediment Control
Management of stormwater runoff during construction is necessary to avoid pollution of downstream
waterways from sediment and gross pollutant loading. Impacts of inadequate erosion and sediment control
downstream from the site include:
traffic safety problems;
blocked drains;
24 Arakoon Street, Sunshine Beach QLD 4567
Job No – S18-003 STORMWATER MANAGEMENT REPORT 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Report.PDFRelated documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.