2.2 Lawful point of discharge
Stormwater runoff from the existing site initially falls east as overland flow, prior to concentrating due to the
slope of the land and discharging to Sunshine Beach.
Stormwater runoff from impervious areas of the development is proposed to be directed to an underground
tank located at the rear of the site. Runoff from the tank shall discharge via infiltration or shall surcharge and
discharge east to Sunshine Beach when at capacity as per existing conditions. Stormwater runoff from
pervious areas at the rear of the site shall similarly discharge east to Sunshine Beach. Refer to Appendix B
for further information.
2.3 Flooding
According to the NSC planning scheme flood hazard overlay mapping the development site is not subject to
flooding from any sources.
3. Stormwater Quantity Management
The stormwater quantity analysis of the existing and developed site conditions has been undertaken with
reference to the requirements and procedure outlined by:
Queensland Urban Drainage Manual (QUDM)
Australian Rainfall and Runoff Volumes 1 & 2 (Aust R&R)
The following section of the report discusses the proposed development’s impact on peak stormwater runoff
and total runoff volume from the site and compares the existing site condition to ensure a no worsening
effect to downstream land.
3.1 Catchment Summary
Pre-Developed Site
The existing site consists of vacant land. Stormwater runoff initially falls east as overland flow prior to
concentrating and discharging to Sunshine Beach.
The existing site area is approximately 635m2 and is fully pervious (fi=0.0).
Post-Developed Site
The development involves the construction of a single dwelling and ground level features. Runoff from
impervious areas of the development is proposed to discharge via infiltration or overland to Sunshine Beach
when the tank surcharges. Runoff from pervious areas at the rear of the site shall similarly discharge
overland to Sunshine Beach as per existing conditions.
The catchment area remains unchanged at approximately 635m 2. The total impervious area was calculated
to be approximately 420m2 which equates to 66% fraction impervious (fi=0.66).
3.2 Stormwater Detention & Infiltration
Stormwater runoff from developed areas of the site shall be directed to a proposed infiltration tank which
shall incorporate stormwater detention to ensure the peak flow rate and total runoff volume discharging to
Sunshine Beach are reduced to pre development levels.
The Atlantis Flo-Tank Modular tank system was adopted as part of the stormwater design. An infiltration rate
of 0.6m/d was adopted based on information contained in the geotechnical report prepared by Soil Surveys.
Refer to Table 1 and Appendix B for further details of the proposed system.
24 Arakoon Street, Sunshine Beach QLD 4567
Job No – S18-003 STORMWATER MANAGEMENT REPORT 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Stormwater Report.PDFRelated documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.