Council archive · source document
07/1447 - MCU - Multiple Housing Type 2 Duplex [As Published] · 132007.1447
INTEGRATED PLANNING ACT 1997 "Operational work that is tidal work or work in coastal management district For tore information refer to Guide 18. For more information about prescribed tidal work in boca! govemment tidal areas refer to Guide 24. Unless you answered “none of the above’ to Q9, the application requires assessment by the Environmental Protection Agency (EPA). fan agency other than EPA is the assessment manager for the application, EPA is a concurrence agency for the application in telation to this matter. Local government is the assessment manager for al prescribed tidal work. IDAS Assessment Checklist, Version 20, 2 Apri! 2007 9. The application involves operational work that is: ( tick the applicable box/es) (1 (i) _ tidal work’ as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work - complete Part M of Fonn 1; oF Oi C1 Gi) Part M of Form 1 if any box/es (a) to (i) below are ticked. constructing or installing works in a watercourse between MHWS and HAT (ie. other than those works in tidal water) where the development has been determined not to be assessable against the Water Act 2000; constructing a canal‘? intended to be connected to tidal waters; Oa) CI (b) Oe Od He) OW O@) Oth) Dt constructing an artificial waterway; reclaiming land under tidal water; tidal work that is prescribed tidal work’ other than in a canal’2 -complete Part P of Form 1; or carried out within a coastal management district under the Coastal Act and for - complete disposing of dredge spoil or other solid waste material in tidal water; interfering with quarry material on State coastal land above high-water mark; draining or allowing drainage or flow of water or other matter across State coastal land above high-water mark; removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area and above high-water mark; constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, above high-water mark; or . Ll (iv) none of the above. Operational work below high water mark For more information refer to Guide 18. For more information about prescribed tidal work in local govemment tidal areas refer to Guide 24. Unless you answered “none of the above’ to --Q10, the application triggers referral to 10. The application involves operational work that is: ( tick the applicable boxes) (1) (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or 71 (ji) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF CO (ii) carried out within a coastal management district'S under the Coastal Act and for - ane Ba enero ODM 7" FF (ay disposing of dredge spoil or other solid Waste material in tidal water - complete Pait ~~~ Local goverment is the assessment manager Mof Forn 7, for all prescribed dal work. (1 (b)_ rectaiming land under tidal water - complete Part M of Form 1; oF (1 (c) constructing a canal’2, if the canal is associated with reconfiguring a lot - complete Part M of Form 1; Dd (iv) none of the above. Coastal management 11. The application involves: (tick the applicable box/es) For more information refer to Guide 18. (J (i) a material change of use assessable under a planning scheme involving operational Unless you answered “none of the above” to work carried out completely or partly in a coastal management district" Q11, the application requires assessment by the 7 | . . Environmental Protection Agency (EPA). DC (ii) a material change of use assessable under a planning scheme involving building ttan agency other than. EPA is the assessment work, carried out completely or partly in a coastal management district that is - contaence ager be te epteacn in « the construction of a new premises with a GFA‘ of at least 1000m2 telation to this matter. « the enlargement of the GFA of existing premises by more than 1000m? Cl (iii) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated completely or partly in a coastal management district (1 (iv): reconfiguring a.fot’’ assessable under schedule 8 of the IPA and in connection with the construction of a canal'2 — complete Part Mof Form 1 El (v) none of the above 10 Tidal work is defined in sch 10 of the IPA. u1 Prescribed fidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area. 142 Canal means canal as defined under the Coastal Protection and Management Act 1995 13 Tidal work is defined in sch 10 of the IPA. 14 Prescribed fidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local goverment tidal area. 15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as. a coastal management district under section 47(2) of that Act 16 GFA is defined in sch 14 of tha IPA fo mean the gross floor area For a definition of how to calculated GFA, go to the planning scheme against which the application fs being assessed. v7 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the raconfiguration is associated with the construction of an artificial waterway, must be accompanied by the application for the operational works to construct the arfificial waterway. Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1447 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.